MI NISTRY OF WATER RESOURCES, WORKS AND HOUSING

COMMUNITY WATER &SANITATION AGENCY REQUEST FOR PROPOSAL (RFP)

4 CONSTITUENCIES (5 DISTRICTS) WAT ER SUPPLY PROJECT

REPUBLIC OF GHANA

REQUEST FOR PROPOSAL FOR T H E ENGAGEMENT OF

PRIVATE SYSTIEM OPERATOR (PSO) (I N THE VO LTA REG I ON )

1. The Government of the Republic of Ghana, with support from the Austrian Government through the Ministries of Finance and Water Resources Works and Housing, has allocated funds to cover the cost of construction of Piped Water Supply System for 4 constituencies (5 Districts) in the Volta Region. The project involves the construction of Volta River based piped water supply scheme including a water treatment plant to serve about 160 communities in the four Constituencies. The Project is in three phases and the second phase is expected to be completed in August 2014 which will provide safe water to about 50% of the intended beneficiaries. The system upon completion of the phase II will covers approx. 3.4km of Raw Water Pipeline, 36.6km of Transmission Pipelines, 100km of Distribution Pipelines, 10 high level concrete tanks and about 111 public standpipes. The system has the capacity, and there is also demand for the extension of the distribution network. The Project area (upon completion of phase III) spans 55Km from North to South and 35Km from East to West.

2. Construction works is in progress and the second of the three phases will be completed by the end of August 2014. CWSAacting on behalf of the District Assemblies intend to engage the services of a Private Water System Operator to manage the facility under a management contract upon the completion of the Second Phase. The scope of the management assignment of the Operator will include mainly:

• Operation and Maintenance of the entire water supply system and treatment plant

• Water tariff setting (in collaboration with the WSMT and the DistrictAssemblies with technical input from CWSA)

• Tariff collection

• Construction of Private Connections and

• Carrvinq out system extensions as and when reauired

(2)

3. The CWSAacting on behalf of the DistrictAssemblies now invite sealed Technical and Financial Proposals from interested firms for the Management of the System.

4. Request forProposals (RFPs) may be purchased for a non-refundable fee of GH¢500 from 16th June, 2014 to 30th June, 2014; between the hours of 1 0:00am to 4:00pm at the office of the Regional Director, CWSA-VR, Ho. Interested firms may also obtain further information at the same address.

Proposals shall be deposited in the Tender Box in the Conference Room of the CWSA VR on or before 12:00 Noon (Local Time) on Tuesday, 14th July, 2014 Proposals should be addressed to:

The Regional Director

Community Water &Sanitation Agency (VR) P.O. Box HP 508, Ho,

Located: Within Ghana Water Company Limited Yard, Ho Telephone Number: 233-91-28186/9,

Facsimile Number: 233-91-28266 Email Address: [email protected]

5. Pre-Proposal site meeting/visit is scheduled to take place and will start at the Treatment Plant Site, Adidome at 10 am prompt on Thursday, 3rd July, 2014. Findings, observations and any other technical issue shall be discussed after the field trip at the Central Tongu DistrictAssembly, Adidome.

6. Proposals shall be valid for a period of 90 days after Proposal opening and must be accompanied by a Proposal Security from a Bank or Insurance Firm acceptable to the Employer. The Proposal Security must be GH¢5,000 (Five Thousand Ghana Cedis) and valid for an additional 28 days after Proposal expiration period. The Proposal Security shall be in the format specified in Form T2.

7. Technical Proposals will be opened on the same day of submission in the presence of participants or their representatives/who wish to attend. Firms whose Technical Proposals are accepted after the Technical evaluation, shall be invited to obserVe the opening of the Financial proposals at a later date.

참조

관련 문서

1.21 And the Director General of the Department of Health will empower the district administration and the police force to take legal action on his behalf. 2

AGREEMENT ON BILATERAL COOPERATION IN PRIVATE SECTOR INDUSTRIAL RESEARCH AND DEVELOPMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF KOREA AND THE GOVERNMENT OF THE STATE

This process on sapphire substrate includes the growth of AIN4 or GaN5 buffer layers at a low temperature followed by the growth of high quality GaN films at a high

On behalf of the Government and the people of the United Republic of Tanzania, I would like to extend sincere gratitude to the Embassy of the Republic of Korea and the

bility of our experimental setup, because viscoelastic property of ppy during electrochemical deposition has been recently examined in the electrolyte solution by Muramatsu et

• 대부분의 치료법은 환자의 이명 청력 및 소리의 편안함에 대한 보 고를 토대로

• 이명의 치료에 대한 매커니즘과 디지털 음향 기술에 대한 상업적으로의 급속한 발전으로 인해 치료 옵션은 증가했 지만, 선택 가이드 라인은 거의 없음.. •

12) Maestu I, Gómez-Aldaraví L, Torregrosa MD, Camps C, Llorca C, Bosch C, Gómez J, Giner V, Oltra A, Albert A. Gemcitabine and low dose carboplatin in the treatment of