CAD/CAM
Midterm Presentation CAD/CAM
Midterm Presentation
IPO ( Infinite Plus One ) - Team 1 2006. 11. 20. Mon
Contents
Review 1
Road Map 2
3D Max Animation 3
Cosmos Works Analyses 4
Manufacturing Plan 6
5
What to do next?
5 7
Solid Works Modeling
Review
1
4
Inline Skater Skier Skater
3 in 1 3 in 1
Consumer Target
Consumer Target
Review
Road map
Solid Works Design Cosmo Works Analysis
3D Max Animation
Alias Modeling
Manufacturing Prototype
?
Catia Mold Design Brainstorming / Subject Selection
Freehand Sketch
3D Max Animation
1
4
Disassemble
Close up - Latch Insert
Spring
Movement
<Inline Mode>
Height : 120 mm Length : 220 mm Width : 50 mm
Solid Works Modeling - Inline
Solid Works Modeling - Skate
<Skate Mode>
Height : 100 mm Length : 180 mm Width : 50 mm
Disassemble
Open Close up -
Joint
Insert
Spring
Open
<Ski Mode>
Height : 70 mm Length : 1472 mm Width : 55 mm
Solid Works Modeling - Ski
Before After
Solid Works – Interference Check
Before No error After
Stress Strain
Deformation Displacement
Assumption
500N
500N Restraint
Restraint
Cosmos Works Analysis - Latch
Cosmos Works Analysis - Rail
1
4
Strain Stress
Deformation Displacement
Assumption
1000N
Restraint
Cosmos Works Analysis - Inline
1
4
Strain Stress
Deformation Displacement
Assumption
1000N
Restraint
Strain Stress
Deformation Displacement
Assumption
1000N
Restaint
Cosmos Works Analysis - Skate
Cosmos Works Analysis - Ski
1
4
Strain Stress
Deformation Displacement
Assumption
500N
500N
Restraint
Restraint
Manufacturing Plan for Prototype
Process Material
Boots Rapid Prototype ABS polymer Slide Injection Molding ABS polymer Slide Guide CNC Machining AL 6061
Guides Sheet Metal Forming AL 6061 Skate Edge Sheet Metal Forming AL 6061 Ski Plate CNC Machining AL 6061 Ski Binder CNC Machining AL 6061
Latch CNC Machining AL 6061
Wheel OEM or Injection Molding Poly Urethane or ABS (1:2 Prototype Product)
Manufacturing – Rapid Prototyping
Simulated by Quickslice v64
Manufacturing Plan – Mold Design
Lower mold Catia NC
What to do next?
▽ Reinforcement for structural weakness
- Modify some parts using solid works - Analyze again using cosmos works - Optimization
▽ Consider applying to Snow board
▽ Making product catalogue using Alias
▽ Manufacturing
▽ Assembling
Schedule
Schedules is subject to change!
IPO SCHEDULE LATTER TERM, 2006
1
5
5
8
3
1
11/ 18 11/ 23 11/ 28 12/ 3 12/ 8 12/ 13
Midterm presentation
Structural analy sis and Design O ptimization
Prepare CAD Data for Prototy pe product
Manufacturing Prototy pe product
Prepare for the final presentation
Final presentation