• 검색 결과가 없습니다.

EIFFEL: Energy Initiative Forging Future Engineer Leaders

N/A
N/A
Protected

Academic year: 2022

Share "EIFFEL: Energy Initiative Forging Future Engineer Leaders"

Copied!
40
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Fall 2018

Seoul National University - The University of Tokyo

Instructor: Prof. K.Y. Suh, 031-109, SNU +82-10-5003-8324 kysuh@snu.ac.kr 459.570A_002

EIFFEL: Energy Initiative Forging Future Engineer Leaders

(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)

Plant Reactor type MWe gross

(net expected) Status, start construction Start or commercial operation

FNPP 1 for Pevek KLT-40S 35x2 Const. 5/09 2019

Novovoronezh II-2 VVER-1200/V-392M 1200 Const. 7/09 Comm. 1/2020

Leningrad II-2 VVER-1200/V-491 1199 Const. 4/10 Comm. 2/2022

Baltic 1 (Kaliningrad) VVER-1200/V-491 1194 Const. 4/12, suspended 6/13 ?

Kursk II-1 VVER TOI/V-510 1255 Const. 04/18 04/2022

Subtotal of 6 under

construction 4889 MWe gross

Coolant Demonstration reactor Construction RUR billion R&D RUR billion Total RUR billion

Pb-Bi SVBR 100 MWe 10.153 3.075 13.228

Na (BN-600, BN-800) 0 5.366 5.366

Pb BREST 300 MWe 15.555 10.143 25.698

multiple MBIR 150 MWt 11.390 5.042 16.432

Total: 37.1 60.7

(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)

참조

관련 문서

탄력성 : 사업계획서 작성의 제조건의 변화나 판매수량의 증감 등이 있는 경우 이를 반영핚 관렦 제 항목이 함께 연계하여 변경되어야 하고, 계획이 다 소

In the 1980s, technology corporations in the United States and Japan engaged in a patent war, creating a scenario where companies were forced to "fight patent

MR: Start and end mode output selection, shown here as 0 (output an END output signal on a high or low limit error so that the next weld cycle can start)a. The other selection is

1) Start/stop the pump with the START/STOP buttons on the front panel or START/STOP signal connected to the remote connector or SERIAL COMMUNICATION connector on the rear

Press Player 1 Start Button to select another test or select EXIT and press the Player 2 Start Button to return to the MENU screen.. Note: No changes will be stored unless

The control register is used to enable interrupts, clear the FIFO, define a read or write operation and start a transfer.. The READ field specifies the

B0 Automatic operation start (GOT) M11 Axis 1 Synchronous control mode B1 Home position return (GOT) M12 Axis 2 Synchronous control mode B2 Error reset (GOT) M13

After first field tests, we expect electric passenger drones or eVTOL aircraft (short for electric vertical take-off and landing) to start providing commercial mobility