• 검색 결과가 없습니다.

Present Status and Future Vision of EIA for Railroad Construction Projects

N/A
N/A
Protected

Academic year: 2021

Share "Present Status and Future Vision of EIA for Railroad Construction Projects"

Copied!
7
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

* 한국환경정책・ 평가연구원 환경영향평가부 책임연구원, 정회원

** 한국환경정책・ 평가연구원 환경영향평가부 책임연구원, 비회원

*** 한국환경정책・ 평가연구원 환경영향평가부 연구위원, 비회원

**** 한국환경정책・ 평가연구원 환경영향평가부 연구원, 비회원

(2)
(3)
(4)

23

73 61

41 54 52 71

12 23

28

25 15 22

30

1 18

13

12 17 16

10

1

4 15

5 4 6

22 55

27

42 40

64 65

11

0 20 40 60 80 100 120 140 160 180 200

1997 1998 1999 2000 2001 2002 2003 연도

사업 건수

기타 철도건설 항만건설 도시개발 도로건설

(5)

토지이용 5.2%

수질 14.1%

토양 2.1%

폐기물 8.2%

전파장해 3.1%

교통 2.7%

기타 2.3%

지형・지질 16.6%

동・식물 11.0%

수리・수문 3.0%

대기질 10.6%

소음・진동 15.3%

위락・경관 5.0%

인구・주거 1.0%

수질 7.3%

토양 4.5%

폐기물 6.4%

전파장해 0.2%

교통 6.0%

기타 8.4%

인구・주거 5.3%

위락・경관 10.0%

소음・진동 9.3%

대기질 9.3%

수리・수문 4.2%

동・식물 10.4%

지형・지질 10.8%

토지이용 8.2%

(6)

,

10㎞ 2.6 0.8 3.3

10㎞ (㎞) 2.7 0.7 3.9

(㎞) 1.06 0.83 1.3

10㎞ 6.8 4.8 1.4

10㎞ (㎞) 2.2 0.7 3.2

(㎞) 0.32 0.14 2.3

10㎞ (㎥) 569,443 1,420,624 0.40

10㎞ (㎥) 623,211 1,608,127 0.39

10㎞ (㎡) 30,875 158,234 0.20

10㎞ (㎡) 11,694 57,827 0.20

10㎞ ( ) 3,393 16,629 0.20

(7)

참조

관련 문서

After first field tests, we expect electric passenger drones or eVTOL aircraft (short for electric vertical take-off and landing) to start providing commercial mobility

First, ICT convergence innovation ecosystem creation; Second, expansion of climate smart agriculture and precision agriculture; third, strengthening the on-off linking platform

○ In the future, the goals of Korea’s international agricultural development cooperation projects should be connected with SDGs, and it is important to

The relationship between general characteristics and ethical dilemma shows a significant difference with regard to age, economic status and satisfaction of

John Miller (1996) Public Infrastructure Development Systems.?. 401.649 Cost Planning for Construction

government’s assessment of the project’s technical feasibility, time for completion, and cost.. 401.649 Cost Planning for Construction Projects 10.  Scope of work at

Developed by Davis Langdon & Seah Singapore Pte Ltd, 2002, reformatted by Moonseo Park, SNU, 2005... 401.649 Cost Planning for Construction

flexibility required during construction would be the most critical issues.. 401.649 Cost Planning for Construction Projects