• 검색 결과가 없습니다.

NOT FOR CONSTRUCTION

N/A
N/A
Protected

Academic year: 2022

Share "NOT FOR CONSTRUCTION"

Copied!
6
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Drawing No.

McElhanney ANSI D

Suite 1

5008 Pohle Avenue Terrace BC

Northwest Regional Airport Terrace-Kitimat

103-4401 Bristol Road, Terrace, BC V8G 0E9

AIRCRAFT RESCUE AND

FIRE FIGHTING VEHICLE SHELTER MAIN FLOOR PLAN

SCALE:

1 : 75

NOT FOR CONSTRUCTION

(2)

Drawing No.

McElhanney ANSI D

Suite 1

5008 Pohle Avenue Terrace BC

Northwest Regional Airport Terrace-Kitimat

103-4401 Bristol Road, Terrace, BC V8G 0E9

AIRCRAFT RESCUE AND

FIRE FIGHTING VEHICLE SHELTER MEZZANINE AND ROOF FLOOR PLAN

SCALE:

1 : 75

NOT FOR CONSTRUCTION

(3)

Drawing No.

McElhanney ANSI D

Suite 1

5008 Pohle Avenue Terrace BC

Northwest Regional Airport Terrace-Kitimat

103-4401 Bristol Road, Terrace, BC V8G 0E9

AIRCRAFT RESCUE AND

FIRE FIGHTING VEHICLE SHELTER EXTERIOR ELEVATIONS

SCALE:

1 : 75

NOT FOR CONSTRUCTION

(4)

Drawing No.

McElhanney ANSI D

Suite 1

5008 Pohle Avenue Terrace BC

Northwest Regional Airport Terrace-Kitimat

103-4401 Bristol Road, Terrace, BC V8G 0E9

AIRCRAFT RESCUE AND

FIRE FIGHTING VEHICLE SHELTER SECTIONS

SCALE:

1 : 75

NOT FOR CONSTRUCTION

(5)

Drawing No.

McElhanney ANSI D

Suite 1

5008 Pohle Avenue Terrace BC

Northwest Regional Airport Terrace-Kitimat

103-4401 Bristol Road, Terrace, BC V8G 0E9

AIRCRAFT RESCUE AND

FIRE FIGHTING VEHICLE SHELTER DETAILS

SCALE:

1 : 75

NOT FOR CONSTRUCTION

(6)

Drawing No.

McElhanney ANSI D

Suite 1

5008 Pohle Avenue Terrace BC

Northwest Regional Airport Terrace-Kitimat

103-4401 Bristol Road, Terrace,BC V8G 0E9

AIRCRAFT RESCUE AND

FIRE FIGHTING VEHICLE SHELTER DETAILS AND SECTION

SCALE:

1 : 75

NOT FOR CONSTRUCTION

참조

관련 문서

SA phenomena and behavior analysis, SA analysis and evaluation, Code maintenance, PSA, Severe Accident Management, etc. Engineering

The Ministry of Urban Development and Housing-Federal Government Buildings Construction Project Office invites sealed bids for category I / BC 1 or GC

Statistics for mass loss, duration of failure, and HCl, HCN, HF, and CO emissions are shown in Table 1. This data is taken directly from all of the cell tests. This

반지층 (Basement Floor) 1층 (Ground Floor)... Nishizawa

How to Choose the Correct Screw Which Screw for Which Application SPAX Design Information... Altenloh,

[r]

The analysis results of differences in tenacity according to the career of winning a prize indicate some differences in desire for victory, fighting spirit,

(net expected) Status, start construction Start or commercial operation. FNPP 1 for Pevek