• 검색 결과가 없습니다.

Gardening Services

N/A
N/A
Protected

Academic year: 2022

Share "Gardening Services"

Copied!
2
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Gardening Services

 All gardening services for Embassy’s premises such as chancery’s, consular section, ambassador residence, HRD office, 3 staff house, tennis court, swimming pool, etc.

- Branch cutting, Grass cutting, Tree/Grass/Flower planting and maintaining and cleaning for all gardening work in/out side of building.

Electrical Services

 Routine checkup of all the electrical System & appliances which includes faulty bulbs, lights, fans, switches, sockets, short circuiting lines, re-wiring, plug points, managing tangled wires, load balancing and any other task.

 Maintenance of Circuit Breakers and Distribution Panel.

 Routine checkup of telephone(including dedicated; the leased line from PTCL) line and distribution board.

 Installation/removal/location shift of various electrical equipment such as A/C, phone, PC, washing machine, refrigerator, etc. where necessary.

 Maintenance of the office high voltage transformer, main electric meters, main power supply in liaison with Islamabad Electric Supply Company IESCO.

 While installing high power consumption electrical device i.e. Heater, A/C, etc. the contractor should access electric current load between each electric phase to ensure electric load is equally shared in each phase to avoid any accident.

 A thorough checking up to all the electrical systems which includes cleaning of all panel junctions, tightening of all connections, checking/cleaning/greasing of all contracts.

 To repair or arrange all kinds of electronic and electrical items.

 Checking, repair/replacement of all switches of light fittings, sockets and cleaning of all electrical equipment and accessories

 Inform in advance of any planned electrical shut down.

 Routine checkup for all the other electrical works.

 Routine checkup for all the VRF(in future), Air condition system issues.

 Maintaining overall air conditioning equipment.

 Cleaning air filters.

 Check and repair the units for any abnormal operation.

 Check the refrigerant pressure; Filling of Gases in chiller.

 Check the VRF(in future) system and repair all defects as required.

 Check and maintain the Panels of Air conditioner in the office and Outdoor unit of Air conditioner.

 Any other electrical task assigned by the Administration.

(2)

General maintenance

 Routine checkup for all the general maintenance & repair work. The work includes also maintenance of flooring, walls, Ceiling, windows, carpeting, blinds, Generator, gas piping and so on.

 Maintenance of Seepage on walls.

 Maintenance of Building entrance automatic door

 Replacement of damaged door and so on.

 Maintenance of the Generator (including all filters, fuel, power connection, etc.)

 Routine checkup for all the plumbing work.

 Routine checkup for all the general maintenance work

• Pipe Lines (Cold and Hot water supply pipe line)

• Toilet leakage repair

• Wash basin/Sink leakage repair

• Tap repair & replacement

• Soil, Waste and Rainwater drainage pipe lines

• Sewer pipe Fixtures

• Flush, shower repair of leakages from pipe.

• Surface and rooftop drains

• Removal of blockage in the pipe line using pressure pump

• Maintenance of firefighting pumps and control panel

• Maintenance of fire extinguishers

• Maintenance of Smoke and fire detection system(in future)

• Routine checkup for all the carpentry work on a weekly basis.

 Repair of desk, chair, windows/door disorder, doorframe, door lock, sealing doors and window

 General Carpentry work including change/repair of locks, Shelves, Office furniture, cupboard etc.

참조

관련 문서

12) Maestu I, Gómez-Aldaraví L, Torregrosa MD, Camps C, Llorca C, Bosch C, Gómez J, Giner V, Oltra A, Albert A. Gemcitabine and low dose carboplatin in the treatment of

Levi’s ® jeans were work pants.. Male workers wore them

$485; electrical wiring, $700; repair expense because the machine was improperly handled, $100; and rental of a special crane, $635... The transaction was initially

Electric, Control & Instrumentation Engineering, Circuit Analysis, Automation Equipment, Power Electronics, Electrical Engineering / Electrical Application,

Based on a modified library search routine, these selective data reduction methods retrieve all or nearly all of the compounds of in ­ terest, while rejecting the

(1) After required installation and wiring have been completed, turn on the POWER switch of the Control Unit, and make sure the POWER switch lights red LED to show

There are four major drivers to the cosmetic appearance of your part: the part’s geometry, the choice of material, the design of the mold (or tool), and processing

Like conventional thermocouples, all IR thermocouples do not require external power and plug into your controller, PLC, data logger, recorder or data acquisition