Western Gas

Equus Gas Project

(2)

100% interest in Equus Gas Project

• Strategically located on the North West Shelf

Fully Appraised Resource

• Independently certified resource – 2 Tcf of gas and 42 MMbbls of condensate (2C)

Development Ready

• US$1.5B spent on exploration,

appraisal and development studies by Hess

Access to Multiple Gas Markets

• New build mid-scale 2 MTPA LNG

• Backfill and expand existing LNG plants

• Domgas supply shortfalls from 2020 Upside Potential

• 9 Tcf risked exploration portfolio

• High quality, low-risk undrilled prospects

Equus Gas Project

Development-ready, 100% privately-owned gas resource

(3)

WA#518#P WA#474#P

WA#70#R WA#519#P

WA#390#P

Snapshot

Glenloth Glencoe

Briseis Bravo

Rimfire Nimblefoot Hijinx

Mentorc Chester

Equus Gas Project

Independently certified 2 Tcf gas and 42 MMbbl condensate

Gross Contingent

Resource 1C 2C 3C

Gas (Bcf) 1,343 2,028 3,223

Condensate (MMBbl) 26.6 41.5 68.4

• US$1.5 billion spent since 2007 on exploration and appraisal:

• 17 explorations wells for 15 discoveries

• 4 appraisal wells

• 5 dynamic well tests

• 9,100 km23D seismic

• FDP and FEED completed

• Environmental approvals advanced

• Historic expenditure provides over US$1.5 billion of deferred income tax and Petroleum Resource Rent Tax credits

• One Retention Lease and four Exploration Permits = 4,760 km2

• Independently certified resource of 2 Tcf (2C) Gaffney Cline & Associates 2017:

(4)

Integrated Upstream to Nearshore LNG Development

100% control of project from reservoir to international LNG market

Development Plan

• 3 wells at RFSU

• 250 MMscfd and 7,000 BOPD Subsea Infrastructure

• Subsea wellheads, flow lines, manifold and production risers Offshore Processing Facility

• FPSO vessel with condensate stripping, gas dehydration and compression

Dry Gas Export Pipeline

• 200 km offshore pipeline with connection to domgas market Nearshore LNG

• Located in protected nearshore waters

• 2 MTPA LNG capacity

• Integrated liquefaction, storage and loading facilities

100% control of project enables speed to First Gas from 2023

(5)

Development Partnering

Partnering with McDermott-BHGE drives Equus from FEED to production

McDermott-Baker Hughes GE Exclusive Development Partner & EPCIC Contractor

• McDermott-BHGE provides a world-class Development Partner with the

experience, skills, products and services to help drive Equus from FEED to

production

• Development agreement is for exclusive provision of project development services from pre-FEED and FEED studies through to engineering, procurement,

construction, installation and commissioning (EPCIC)

• Integrated “Design-to-Install” contracting approach is an Australian-first for a

project of the size and scale of Equus and will help deliver an efficient development plan, enhance project economics and reduce time to first gas

(6)

Gas Marketing Plans

Establishing partnerships with foundation LNG customers

LNG

LNG Growth in Asia presents marketing and investment opportunities for the Equus Project

• Asia remains the driver of long-term LNG demand

• Supply from existing LNG facilities will peak in early 2020 and decline thereafter as fields deplete

• Post 2030 LNG demand growth in Asia expected to accelerate

• Western Gas is working towards establishing foundation customers for LNG offtake and securing the threshold offtake volumes that will be required for project financing prior to planned FID

LNG Imports (1990-2040) by Region (BCF/d - billions of cubic feet per day)

Western Gas is working towards establishing a foundation customer for LNG offtake as a key

partner for the Equus development

(7)

Project Funding Strategy

Western Gas to leverage appetite for energy infrastructure investment demand

Western Gas plans to finance the Equus Development through a mix of:

Western Gas is progressing discussions with energy infrastructure investors to progress arrangements towards binding conditional agreements

Infrastructure Investment

• The FPSO to be built, owned and operated by a specialist provider of offshore production platform with a lease

• The Offshore Pipeline to be owned and operated by a third party pipeline specialist pipeline partner with a tariff

• The LNG processing facility intended to be owned by a third party infrastructure partner with a tolling agreement Western Gas is progressing initial term sheets with lead project financiers

Project Finance

• Advice from financial institutions is that Equus project capital structure could achieve gearing ratios between 60-70%.

• The project finance options for Equus include senior debt, syndicated loan, bond or reserves based lending

Western Gas is evaluating investment and farm-in opportunities into the Equus Gas Project with a partner that brings financial, infrastructure, marketing and/or operating experience

Equity

• Equity deemed a requirement for project finance is intended to be sourced from either a private placement into Western Gas, Initial Public Offer (IPO) and/or investment from farm-in partner/strategic investor.

(8)

2019

Q1 Q2 Q3 Q4

2020

Q1 Q2 Q3 Q4

2021 to 2024

Y1 Y2 Y3 Y4

Proj. Devt.

Subsurface

Gas Sales

Proj. Finance Approvals

Execution

Production Forecasting FDP Pre-FEED

FEED GSA HoA

GSA

Funding Plan

1stGas FID

Production Licence

42 Months Execution Funding Completed (subj. to FID)

HoA (s)

RFSU

Project Timeline & Milestones

Driven to meet LNG market needs for First Gas by 2024

Red Flag Review

(9)

High Quality Exploration Portfolio

Material, low risk undrilled portfolio

• Undrilled portfolio supported by amplitude anomalies & geophysical attribute analysis

• Mean risked GIIP on prospects > ~ 9 TCF

• Multiple geophysical analogs to Glenloth & Mentorc identified

• Potential to add more high-value condensate to the product stream

• New play types identified

Oxfordian Amplitude Oxfordian Structure

Mean GIIP TCF

WA-70-R Briseis Deep 0.6 0.3

Glenloth North 0.8 0.3

Various 1.2

WA-390-P Various 1.0

WA-518-P Gaulus 1.1 1.0

Posinatus 0.5 0.4

Oxfordian Amplitude 0.9 0.3

Merriwee 6.2 1.3

Wodalla (on Block) 0.7 0.2

WA-519-P Sasanof (inc WA-70-

R, WA-390-P) 4.2 3.1

Total 9

Permit Prospect Mean Risked

GIIP TCF

(10)

Equus Gas Project

A new and independent gas supply

Glenloth Carnian 300 Extended DST November 2010

Strategic Asset

• Unique 100% ownership of mature 2 Tcf project in the heart of Australia’s premier petroleum producing basin

Development Ready

• Leverage the US$1.5B risk capital spent by Hess on exploration, appraisal, testing and development studies

World-class Project Development Partner & EPCIC Contractor

• McDermott-BHGE provides experience, skills, products and services to help drive Equus from FEED to production

Speed to Market

• 100% control of project and integrated development plan enables speed to First Gas from 2023/24

Customer Focused

• Upstream Development Plan provides access to multiple markets for LNG and domestic gas, with innovative pricing opportunities for foundation customers

Equus provides a new and independent gas supply

on the North West Shelf

(11)

Western Gas

Contacts

Western Gas

www.westerngas.com.au info@westerngas.com.au

Andrew Leibovitch Executive Director

aleibovitch@westerngas.com.au +61 417 981 817

Will Barker

Executive Director

wbarker@westerngas.com.au

+61 417 449 501

참조

관련 문서

Basic aspects of AUTOSAR architecture and methodology Safety mechanisms supported by AUTOSAR.. Technical safety concepts supported by AUTOSAR Relationship to ISO

Underdal, Sharing the Burden of Greenhouse Gas Mitigation: Final report of the joint CICERO-ECN project on the global differentiation of emission

Major improvements on the contract are offered. First, a broader menu of gas supply services is called for including interruptible and priority services. In

The purpose of this study is to define the concept of affordance in multi-media environment and to seek development plan of more efficient interface

So gas dispersion characteristic such as superficial gas velocity (J g ), bubble size (d b ), gas holdup (  ) and bubble surface area flux (S b ) have

Assumption.. 5) Properties of Saturated Liquid-Vapor Mixture.. 6) Internal Energy of Superheated Vapor.. 7) Temperature of Superheated Vapor.. 8) Approximating Compressed

(a) Irreversible expansion of an ideal gas with no heat or work as Joule found no temperature change of a dilute gas allowed to expand in an isolated system..

– Given an equilibrated gas-liquid system containing only a single condensable component A, a correlation for , and any two of the variables y A (mole fraction of A in