• 검색 결과가 없습니다.

Frelan Acido Besin

N/A
N/A
Protected

Academic year: 2022

Share "Frelan Acido Besin"

Copied!
4
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Frelan Acido Besin

PERSONAL DATA

Age: 31

Date of Birth: Dec 8, 1976

Gender: Male

Civil Status: Married

Height: 168 cm

Weight: 70 kg

Nationality: Filipino

Religion: Christianity - Others

EDUCATION

Highest Education Second Highest

Education Education Level: Prof'l License(Passed Board/Bar/Prof'l License

Exam) High School Diploma

Education Field: Engineering(Civil)

Course: B.S. Civil Engineering High School Grad

School/University: Technological University Of The Philippines-Manila Manila High School Location: Manila

Date: Jun 1993 - Apr 1998 Jun 1989 - Mar 1993

LICENSES/CERTIFICATIONS License/Certification

Exam Taken License/

Certification No. Date 1. CIVIL ENGINEERING LICENSURE

EXAM 83172 Nov 21, 1998

WORK EXPERIENCED

I have been working for 10.0 year(s).

Position: PROJECT MANAGER

Duration: Sep 12, 2006 - PRESENT(2.2 yrs)

Company: MGS CONST. INC. (A Manny Villar Group of companies) Company Industry: Construction / Building

Location 2nd flr. Las Pinas Bldg Center Talon 2 Las Pinas city Department: High Rise Department

1.

Job Description: REMBRANDT TOWER (CROWN ASIA) -7TH STOREY Residential Condominium buildings

BELLINI TOWER - 7TH STOREY Residential Condominium buildings RENOIR TOWER - 12TH STOREY BUILDING

*Handling and supervising 12 engineers on site compose of rebar engr., formworks engr., night shift engr. Cadd operator, cost engineer ,

surveyor, electrical engr., plumbing engr. Architectural engr., office engr.

Purchasing engr. Safety engr.

*Monitoring and overseeing the whole operation and status of the projects

(2)

* I make sure that the task I have given with my engineers are properly implemented

* I do the presentation report of the actual cost vs. budget cost with the president, vp-operation, and chief accountant and advise solutions and recommendations if problems were encountered once a month

* I monitor the whole operation including the equipments such as tower crane, Alimak, etc. I ask the warehouse supervisor the report of

inventories of materials and conditions of the equipments.

* I make sure that I’m on a right schedule by monitoring delays on bar- chart and immediately imposed catch up schedule and fast track schedule to overcome delays.

* Im also monitoring the quality of work to my engineers

* Strictly implementing Environmental House & Safety requirements on site.

* Im monitoring the work productivity report of my engineers for every sub-cons they handled

* Im directly reporting with the VP-Operations

* Im make sure that the materials purchase was less on the budget and approved by the consultants

* Implementing meetings such as sub-con meeting, coordination meeting, meeting with consultants and representative of Crown Asia Position: Site Supervisor

Duration: Nov 3, 2004 - Aug 15, 2006(1.8 yrs)

Company: Makati Dev. Corp. (The Columns Ayala Ave. Proj.) Company Industry: Construction / Building

Location 10TH FLR. LGU/FGU TOWER ALABANG Department: Operation

2.

Job Description: THE COLUMNS PROJECT (AN AYALA LAND CORPORATION) 3 towers - 32nd storey Residential Condominium Tower

* Implementing Installation of Aluma Forms for slab/beam and Efco Panel for columns, shear wall, corewall of tower 3 Table forms technology

*Responsible in scheduling of concrete batches in MDC batch plant

*Supervising manpower for about 90 carpenters,10 masons and 20 laborers

*In charge in supervising 25th-roof deck residential finishes after pirated form structural department

*Monitoring the quality of works before and after installation

*Presenting a construction methodology for such a particular task

*Attends weekly coordination meetings

* Evaluating sub-contractors Accomplishments Billings

* Preparing Productivity report for every task done on site

* Handling finishing sub-contractors

* Directly reporting to the Project Superintendent

* Assisting the representative of the CII developer to the units to be punchlisted and turn-overed

(3)

Position: SR. PROJECT ENGR.

Duration: Dec 3, 2003 - Aug 21, 2004(0.7 yrs) Company: Le Blanc Construction

Company Industry: Telecommunication Location Makati City

Department: Engineering 3.

Job Description: Estimating budget cost for each cell sites Preparing cutting list for tower foundation

Preparing quantity and materials take off for each site Monitoring the qualities and quantities to be save Act as supervisor handling 5 sites at a time Attends Coordination meeting with Alcatel Position: Project In-Charge

Duration: Feb 15, 2003 - Dec 2, 2003(0.8 yrs) Company: Guryang Philippines Inc.

Company Industry: Construction / Building Location Ortigas Pasig

Department: construction 4.

Job Description: 33rd storey residential building

Supervising 3rd-7th flr. finishing includes ceiling (acoustic & ficem), tile works , painting, masonry works, plastering etc.

Preparing Billings

Handling & supervise 3 project engineers

Position: PROJECT ENGINEER

Duration: Apr 5, 2002 - Apr 8, 2003(1 yrs) Company: ALTITUDE BUILDERS DEVELOPMENT Company Industry: Construction / Building

Location GUADALUPE NUEVO MAKATI Department: BUILDING

5.

Job Description: 33rd AIC EMPIRE TOWER

Finishing Works from 3rd flr.-7th flr.

includes Masonry, Carpentry, Tile works, remaining Civil Works at 27th- 32nd floor such as rc-wall, suspended slab and stairs from floor to floor.

Supervising Civil Construction

In Charge in preparing cost estimate for a particular item of works specially on bidding

Bar chart scheduling of every scope of of works using excell Position: Construction works Engineer

Duration: Nov 15, 1998 - Mar 15, 2002(3.3 yrs) Company: James Lim & Associates

Company Industry: Construction / Building Location Quezon City

Department: Construction management 6.

Job Description: Inspection of qualities and testing of materials delivered on site Monitoring of quality and fast track of the project

Preparing minutes of the meeting Act as owner representative

Evaluating contractors accomplishments

(4)

SKILLS

Skill Yrs of

Experience Remarks 1. Microsoft Excel, Word,

Microfeap, Staad Pro. MS Project, Autocad 2000

10

TRAININGS/SEMINARS

Date Topic/Course Title

Nov 7, 2006- Nov 10,

2006 Project management

Novue solutions ( Construction management company) Arch. JoJo Sebastian

Feb 6, 2001- Feb 6, 2001 Construction Management

Philippine Institute of Civil Engineers Makati City

Apr 15, 2000 Modern plumbing Moldex

Moldex head office

참조

관련 문서

We acknowledge AMRO’s contribution to the regional outlook discussion at the ASEAN+3 Leaders’ Meeting, ASEAN Finance Ministers’ and Central Bank Governors’ Meeting

These activities emphasize on preparing and equipping isolation center in each region, to expand the screening programs from the international airports to

For the OECD as a whole, the incidence of part-time employment increased by close to 5 percentage points between 2000 and 2012, while overall employment rates declined since

The study undertaken has highlighted different parameters (such as sources and materials used for seeking information, methods used for meeting information needs, library

Objectives: 1) Using the available Cancer Survival data of 1 year, 3 years and 5 years for selected cancer sites, a best fit model to be identified for each site; 2) The

Thus, if a search strategy exists for a connected graph, then the graph can be cleared by placing the searchers at a set of vertices and then, at each time step, moving

Unlike many previous works, the proposed scheme applies the signcryption paradigm to the proxy blind signature technology for handling multiple blinded messages at a time

we use 33 and 50 ms for the theoretical model, with a 50% probability for each one. Quake III can be considered as an example of deterministic inter-packet time, with a value