GMR ENERGY LIMITED
GMR Energy limited directly or through its affiliates proposes to establish 2 * 350 MW – 370 MW Natural gas based combined cycle power plant at Vemagiri, Rajahmundry, East Godavari District, Andhra Pradesh.
The proposed project would be located next to the existing 388.5 MW Combined Cycle Power Plant which is already in operation. The Plant site is located in Vemagiri Village in East district of Andhra Pradesh about 12 kms from Rajahmundry. Site is just 1.5 kms away from Rajahmundry – Kakinada segment of highway No.NH-5. The nearest airport is Rajahmundry at about 32 kms from site and the nearest sea port is Vizag, which is at a distance of about 200 kms from project site.
Land required for the project is already in possession. The water for proposed project will be drawn from the river Godavari. The point of water drawl is around 7 kms away from the site. The permission required for the drawl of water has been obtained by the project proponent. All the formalities for obtaining the Environmental Clearance are completed and expecting the clearance shortly. Project proponent has already submitted the application for the supply of fuel to the project and the evacuation of the power from the project.
Exisiting 388.5 MW power plant is connected to the GAIL network through which the gas is being supplied.
This GAIL gas network is also connected with the East West gas pipeline network which gives the flexibility of using the RLNG for the proposed project. The project proponent has already submitted its application with GAIL for the last mile connectivity of the gas pipeline to the project. Project proponent is already in discussions with the FI’s for the funding of the project.
Site Information:
Average dry bulb temperature Highest wet bulb temperature Highest ever temperature recorded Lowest ever temperature recorded Relative humidity
Elevation above MSL
Latitude : 16°55’44.08” to 16°55’12.24”
Longitude : 81°48’57.61” to 81°48’16.27”
Scope of Work:
Installation of the complete 2 x 350
mechanical, electrical, controls and instrumentation and civil / to Gas turbine generator, HRSG, Steam turbine generator specified herein on turnkey Engineering,
project.
1. The scope of work covers design testing at manufacturer’s and / or his sub
shipping and forwarding, transport and delivery to site including unloading from carriers at site, handling and storage at site, intra site transport, erection, testing, commissioning, painting, carrying out performance and guarantee tests at site of th
and in the combined cycle
handing over of the plant to the owner and also long term service agreement (LTSA). The scope also includes delivery of essent
spares for 3 years operation and maintenance (O&M).
2. The basic scope shall also include all insurance i.e. general third party and automobile liability, workers’ compensation and Employer’s li
3. All equipment and works shall conform in all respects to high standards of design engineering, materials of construction, workmanship and be capable of performing in continuous commercial operation.
4. The scope shall include all services including specialised services necessary for proper erection, commissioning and performance testing of all items of the plant covered under this Contract 5. All necessary co-ordination with regard to sub
Bidder. The Owner will communicate only with the Bidder for all matters pertaining to this Contract.
6. Rectification of defects and deficiencies including replacement to achieve Performance Guarantees and / or remedying of defec
occurring during Warranty Period.
: 29.2° C : 27.6° C Highest ever temperature recorded : 47.2° C
: 13.9° C : 71%
: 24.5 m
16°55’44.08” to 16°55’12.24”
81°48’57.61” to 81°48’16.27”
350 - 370 MW Gas Based Combined Cycle Power P
mechanical, electrical, controls and instrumentation and civil / structural / architectural works pertaining Steam turbine generator, their auxiliaries and Balance of Plant ngineering, Procurement and Construction (EPC) basis for the proposed
covers design, engineering, procurement, manufacture, inspection and testing at manufacturer’s and / or his sub-Bidders’ works, packing into properly sized units &
shipping and forwarding, transport and delivery to site including unloading from carriers at site, handling and storage at site, intra site transport, erection, testing, commissioning, painting, carrying out performance and guarantee tests at site of the systems / equipment
and in the combined cycle including civil, structural and architectural works specified and handing over of the plant to the owner and also long term service agreement (LTSA). The scope also includes delivery of essential / mandatory spares, special tools & tackles and recommended spares for 3 years operation and maintenance (O&M).
basic scope shall also include all insurance i.e. general third party and automobile liability, workers’ compensation and Employer’s liability coverages and all insurance required by law.
ll equipment and works shall conform in all respects to high standards of design engineering, materials of construction, workmanship and be capable of performing in continuous commercial
ll services including specialised services necessary for proper erection, commissioning and performance testing of all items of the plant covered under this Contract
ordination with regard to sub-contracted equipment shall be carried out by the Bidder. The Owner will communicate only with the Bidder for all matters pertaining to this
Rectification of defects and deficiencies including replacement to achieve Performance Guarantees and / or remedying of defects and deficiencies including replacement discovered or occurring during Warranty Period.
Plant including all structural / architectural works pertaining , their auxiliaries and Balance of Plant as onstruction (EPC) basis for the proposed
engineering, procurement, manufacture, inspection and Bidders’ works, packing into properly sized units &
shipping and forwarding, transport and delivery to site including unloading from carriers at site, handling and storage at site, intra site transport, erection, testing, commissioning, painting, e systems / equipment in simple cycle including civil, structural and architectural works specified and handing over of the plant to the owner and also long term service agreement (LTSA). The scope ial / mandatory spares, special tools & tackles and recommended
basic scope shall also include all insurance i.e. general third party and automobile liability, ability coverages and all insurance required by law.
ll equipment and works shall conform in all respects to high standards of design engineering, materials of construction, workmanship and be capable of performing in continuous commercial
ll services including specialised services necessary for proper erection, commissioning and performance testing of all items of the plant covered under this Contract.
shall be carried out by the Bidder. The Owner will communicate only with the Bidder for all matters pertaining to this
Rectification of defects and deficiencies including replacement to achieve Performance ts and deficiencies including replacement discovered or