“ “ Current Status of and Prospects for Current Status of and Prospects for Energy Resources and Infrastructure Energy Resources and Infrastructure

Development of South Gobi in Development of South Gobi in

Mongolia.

Mongolia. ” ”

Presented by Mr.

Presented by Mr. GanbaatarGanbaatar BadgaaBadgaa Department of Fuel Policy and Regulation Department of Fuel Policy and Regulation

MINISTRY OF FUEL MINISTRY OF FUEL

AND ENERGY AND ENERGY MONGOLIA MONGOLIA MINISTRY OF FUEL MINISTRY OF FUEL

AND ENERGY AND ENERGY MONGOLIA MONGOLIA

(2)

Content Content

„„

Coal Resources Coal Resources

„„

Oil Resources Oil Resources

„„

Other fuels Other fuels

„„

Perpective Perpective coal deposits coal deposits

„„

South Gobi Energy Resources South Gobi Energy Resources

„„

South Gobi Infrastructure South Gobi Infrastructure

/Energy supply, Road, /Energy supply, Road, Railway, Water resources/

Railway, Water resources/

(3)

Coal Coal

„„ MongoliaMongolia’’s total inferred coal resources as predicted s total inferred coal resources as predicted around 150 billion tons.

around 150 billion tons.

„„ The preliminary and detailed exploration activities The preliminary and detailed exploration activities resulted in about 23 billion tons of coal reserves.

resulted in about 23 billion tons of coal reserves.

„„ The proved coal reserves are 12.2 billion tons The proved coal reserves are 12.2 billion tons

including 2 billion tons coking coal and 10.1 billion including 2 billion tons coking coal and 10.1 billion

tons of thermal coal.

tons of thermal coal.

„„ Coal deposits and occurrences are located throughout Coal deposits and occurrences are located throughout the country, but most of the coal resources are

the country, but most of the coal resources are concentrated in the east, central and south areas.

concentrated in the east, central and south areas.

(4)
(5)

Oil Oil

„„ Mongolia is oil import dependentMongolia is oil import dependent

„„ But recent prospecting for oil has brought some But recent prospecting for oil has brought some

positive results in Southern and Eastern Regions of positive results in Southern and Eastern Regions of

Mongolia Mongolia

„„ Investment is increasing reaching Investment is increasing reaching 433,1 433,1 ml US in ml US in 20082008,,

„„ In 2 oil field In 2 oil field –– 150 exploration wells, they would 150 exploration wells, they would pump up

pump up 140 140 000 tons of oil in 2008, planning to 000 tons of oil in 2008, planning to reach

reach 300 300 000 tons in 000 tons in 20102010. .

„„ But these is not enough But these is not enough to build own refineryto build own refinery

(6)

Other fuels Other fuels

„„ Liquefied petroleum gas (LPG) is in use and Liquefied petroleum gas (LPG) is in use and otot is an is an imported product

imported product

„„ To date LPG is used for household consumption, To date LPG is used for household consumption, transport, tourism and industry

transport, tourism and industry

„„ in 2007 LPG was supplied to 20 thousand customers in 2007 LPG was supplied to 20 thousand customers in in aimagsaimags and other local areas and over 12 thousand and other local areas and over 12 thousand

customers in Ulaanbaatar.

customers in Ulaanbaatar.

„„ It is noted in the Uranium Redbook of 1995 that It is noted in the Uranium Redbook of 1995 that Mongolia has a some uranium resources, which Mongolia has a some uranium resources, which

totals about 1,8 % /83000 tons/ of the world uranium totals about 1,8 % /83000 tons/ of the world uranium

reserves.

reserves.

(7)

Coal Policy Coal Policy

„„

Due to of insufficient oil, natural gas, coal is Due to of insufficient oil, natural gas, coal is and will remain as main energy resource for and will remain as main energy resource for

Mongolia.

Mongolia.

„„

The Government policy is aimed to provide The Government policy is aimed to provide national security and sustainable development national security and sustainable development

of Mongolia by introducing economic and of Mongolia by introducing economic and

environmental friendly clean coal technology environmental friendly clean coal technology

and production such as coal liquefaction, coal and production such as coal liquefaction, coal

gasification and coal

gasification and coal - - chemical industry chemical industry development.

development.

(8)

Perpective

Perpective coal deposits coal deposits

Central Mongolia Central Mongolia

„„ ShiveeShivee-Ovoo-Ovoo /2,7 bln/2,7 bln tons of tons of brbr coal, / coal, /

„„ //TugrugnuurTugrugnuur and and TsaidannuurTsaidannuur brown coal brown coal --2 2 blnbln//

East Mongolia East Mongolia

„„ AduunchuluunAduunchuluun /100 mln/100 mln brown coal/brown coal/

„„ TugalgataiTugalgatai /3 /3 blnbln sub bituminous, Tethys mining, CVRD/sub bituminous, Tethys mining, CVRD/

West Mongolia West Mongolia

„„ HushuutHushuut /300 /300 mlnmln tons of bituminous and met.coaltons of bituminous and met.coal, /, /

(9)

The South Gobi region is poised for The South Gobi region is poised for

a major boom a major boom

„„ The South Gobi region is poised for a major boom in The South Gobi region is poised for a major boom in economic activity, with a foundation based on

economic activity, with a foundation based on planned development of mines of world class planned development of mines of world class

significance.

significance.

„ Infrastructure for TT and OT will require more than

$1 billion over the next five years.

„„ The Parliament is considering a proposed Investment The Parliament is considering a proposed Investment Agreement with Ivanhoe Mines for the development Agreement with Ivanhoe Mines for the development

of a copper and gold mine at

of a copper and gold mine at OyuOyu TolgoiTolgoi, and a , and a shareholder agreement that relates to proposed shareholder agreement that relates to proposed

development of a coal mine at

development of a coal mine at TavanTavan Tolgoi. Tolgoi.

(10)

South Gobi Coal Resources South Gobi Coal Resources

„„ TavantolgoiTavantolgoi /6,4 /6,4 blnbln tons/tons/

„„ BaruunBaruun NaranNaran /155 ml ton of thermal and met coal, /155 ml ton of thermal and met coal, feasibility study is done, /

feasibility study is done, /

„„ NaryinNaryin suhaitsuhait /identified 250 ml tons of bituminous, /identified 250 ml tons of bituminous, exporting to China, Gansu met plant/

exporting to China, Gansu met plant/

„„ OvootOvoot TolgoiTolgoi //extentionextention of NS, indicated reserve-of NS, indicated reserve-150 150 ml tons, mine put into operation, 85% IM/

ml tons, mine put into operation, 85% IM/

(11)

Tavantolgoi

Tavantolgoi coal coal deposit

deposit

Total reserve : 6.4 billion tons ,and:

Thermal coal : 4.6 billion tons Coking coal: 1.8 billion tons.

(12)

Mongolian Integrated Power System Program

(13)

Energy demand and supply Energy demand and supply

in the south

in the south gobigobi regionregion

1. 1. Electricity demand Electricity demand //big consumers to be buildbig consumers to be build//

„„ OyutolgoiOyutolgoi copper minecopper mine 100-100-227 М227 МWW

„

„ TavantolgoiTavantolgoi coal minecoal mine 100 МW100 МW

„

„ TsagaanTsagaan suvargasuvarga minemine 80 МW80 МW

„„ DalanjargalanDalanjargalan minemine 40 МW40 МW

„„ Free zone of Free zone of ZamynZamyn UudUud 30 МW30 МW

„„ Cement factory of KhukhCement factory of Khukh tsavtsav 20 МW20 МW 2. Electricity supply2. Electricity supply

„„ To build 220 kV DC transmission line UlaanbaatarTo build 220 kV DC transmission line Ulaanbaatar--MandalgobiMandalgobi--Oyutolgoi Oyutolgoi from Central Energy System /

from Central Energy System / 2008-2008-20102010 / / 238 238 blbl tugtug

„

„ To build Thermal Power Plant No.5To build Thermal Power Plant No.5 / 2009/ 2009--20112011 //

„

„ To build Power Plant at To build Power Plant at TavantolgoiTavantolgoi / 2009/ 2009--20122012//

„„ To build power plant complexes To build power plant complexes with with capacity capacity of of 3600 MW3600 MW at Shiveeat Shivee-- OvooOvoo / 2012/ 2012--2015 2015 //

(14)

Energy Supply of South Gobi Energy Supply of South Gobi

„ To build a transmission line to supply Tavantolgoi and Oyu Tolgoi from the Central Electricity System

„ In the medium-term, a coal-fired power plant may be built at Tavan Tolgoi. Depending on the size of the power plant to be developed at Tavan Tolgoi,

„ It may be possible to export power to China.

„„ In longIn long--term, a coketerm, a coke--chemical plant chemical plant

„ the Government will consider whether the investment agreement for Tavan Tolgoi should include provision for the construction of the power plant by the mine developer, by an independent operator, or by the Government.

(15)

Power Plant at

Power Plant at TavantolgoiTavantolgoi

„

„ Installed electricity capacity Installed electricity capacity 600 МW600 МW

„

„ Operation of capacityOperation of capacity 6906 hours6906 hours

„

„ Annual production of electricity 4,1436*10Annual production of electricity 4,1436*109 9 ккW/hourW/hour

„

„ Internal electricity use Internal electricity use 8 %8 %

Total investment

Total investment USD 350 USD 350 millionmillion

(16)

Road Road

„

Plan for a 520 km asphalt road from

Ulaanbaatar to Dalanzadgad, A feasibility study has commenced.

„

Work has started on a BOT road connecting an existing coal mine near Naryin Sukhait to the Chinese border.

„

Oyu Tolgoi’s transport needs can be satisfied with a planned 105 km BOT road to China.

construction once the Investment Agreement is

signed.

(17)

Road perspective

Road perspective

(18)

Railway Railway

„ Rail is the only practical option for shipping the expected volumes of coal.

„ The MoRTT submitted the proposed routes to the National Security Council, and intends that once the routes are approved feasibility studies will be commenced.

„„ TT-Trans Mongolia railway (400 km) -$375-400 million

„ TT –Chinese border (100 km) -$75-100 million

„ As plans for Tavan Tolgoi are developed, the Government will consider whether the investment agreement for Tavan Tolgoi should include provision for the construction of particular railway lines by the mine developer, by an independent operator, or by the Government.

(19)

Gobi Railway Plan Gobi Railway Plan

The issue of rail gauge is being considered by the State Security Council.

China, the principal market uses standard gauge rail.

Mongolia uses the slightly broader Russian gauge.

(20)

Water supply issues

„ The availability of water in South Gobi may constrain the region’s development potential.

„ The extent of water resources in the area is not well- known. Identified several deep aquifers with some volumes of water to meet the mine’s needs.

„„ Possible sustainable alternative sources Possible sustainable alternative sources -- piping water piping water 400400--600 km from rivers to the north. 600 km from rivers to the north.

„„ For the overall limits on regional development it For the overall limits on regional development it

would be useful to conduct a regional study of water would be useful to conduct a regional study of water

resources.

resources.

(21)

Thank you Thank you

for your attention

for your attention

참조

관련 문서

약국은 당초 수집 목적과 합리적으로 관련된 범위에서 정보주체에게 불이익이 발생하는지 여부, 암호화 등 안전성 확보에 필요한 조치를 하였는지 여부 등을

The sample group that satisfied the 10% capital adequacy ratio, the sample company that achieved the net income of 2 billion standard requirement, the

(Taekwondo, Weight Lifting Players) (90 min × 6 days/week) Warming

[r]

Using 1987 data, had 46,400 traffic fatalities in 1924 billion miles or 24 fatalities/billion vehicle miles.. 37% drivers, 18% passengers, 14% pedestrians, 9%

회원국의 영토밖에서 다른 회원국의 , 영토내에서 회원국의 서비스 소비자에게

While consumption of solid fossil fuels (coal and coal products) decreased by 41 % and oil (including petroleum products) decreased by 15 %, consumption of renewables increased

 Sulfonate Anion : 매우 약염기, 안정된 음이온 → 좋은 이탈기.  O─H 결합의 끊어짐이 발생하나 C─O 결합에는 영향이 없음