Auxiliary reinforcement methods such as for-poling and multi-steel pipe grouting etc. are frequently used to avoid a possible collapse of tunnel face, where the ground condition is not favourable as well as geological formation is not sufficient. However, among those methods a suitable reinforcement method is exclusively decided by tunnel engineers experience so far.
Therefore, this study introduces a data-mining technique for the proper auxiliary reinforcement method during uncertainty of tunnelling work. The data-mining technique has widely been used in the field of social science, medical treatment, banking and agriculture etc. A decision-tree together with PDA technique based on tunnel construction data was developed to provide a reasonable reinforcement method in this study. Future study will be focused on the application of this technique in a variety of underground space developments.
신용상태 BAD 20%
GOOD 80%
25-35세 BAD 17%
GOOD 36%
35세 이상 BAD 3%
GOOD 44%
200만원이하 BAD 12%
GOOD 16%
200만원이상 BAD 4%
GOOD 20%
200만원이하 BAD 2%
GOOD 14%
200만원이상 BAD 1%
GOOD 30%
유 BAD 1%
GOOD 28%
무 BAD 0%
GOOD 2%
부모마디
자식마디
종단마디 나 이
월소득 월소득
신용카드 1 Depth
2 Depth
3 Depth
×
(1)
× (2)
×
(3)
Total Fore-ploing
강관다단 대구경강관
조합 No. 4
(20.53) 32.26 48.39 12.90 6.45
%
31 10 15 4 2 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 2
(54.97) 27.71 31.33 28.92 12.05
%
83 23 26 24 10 n Total Fore-ploing
강관다단 대구경강관
조합 No. 1
(100.0) 40.40 34.44 18.54 6.62
%
151 61 52 28 10 n
무
시공위치 도심지터널
보조공법
Total Fore-ploing
강관다단 대구경강관
조합 No. 5
(34.44) 25.00 21.15 30.46 15.38
%
52 13 11 20 8 n
Total Fore-ploing
강관다단 대구경강관
조합 No.18
(0.66) 0.00 100.00 0.00 0.00
%
1 0 1 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 19
(0.66) 0.00 100.00 0.00 0.00
%
1 0 1 0 0 n Total Fore-ploing
강관다단 대구경강관
조합 No. 20
(4.64) 85.71 14.29 0.00 0.00
%
7 6 1 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 21
(11.92) 16.67 61.11 22.22 0.00
%
18 3 11 4 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 22
(2.65) 25.00 25.00 0.00 50.00
%
4 1 1 0 2 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 37
(1.99) 0.00 66.67 33.33 0.00
%
3 0 2 1 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 38
(9.93) 20.00 60.00 20.00 0.00
%
15 3 9 3 0 n Total
Fore-ploing 강관다단 대구경강관
조합 No. 8
(5.96) 66.67 33.33 0.00 0.00
%
9 6 3 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 9
(14.57) 18.18 54.55 18.18 9.09
%
22 4 12 4 2 n
100-41 40-21,20-0
RMR 무
40-21 RMR
20-0 100-41
2D이상
토피고
2D이하
Total Fore-ploing
강관다단 대구경강관 조합 No.23
(3.31) 80.00 0.00 20.00 0.00
%
5 4 0 1 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 24
(5.96) 44.44 22.22 22.22 11.11
%
9 4 2 2 1 n Total Fore-ploing
강관다단 대구경강관 조합 No. 25
(4.64) 0.00 14.29 57.14 28.57
%
7 0 1 4 2 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 26
(6.62) 30.00 20.00 40.00 10.00
%
10 3 2 4 1 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 27
(13.91) 9.52 28.57 42.86 19.05
%
21 2 6 9 4 n Total
Fore-ploing 강관다단 대구경강관 조합 No. 10
(13.91) 38.10 14.29 33.33 14.29
%
21 8 3 7 3 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 11
(20.53) 16.13 25.81 41.94 16.13
%
31 5 8 13 5 n
RMR
100-41 40-21,20-0
인접
40-21 RMR
20-0 100-41
2D이상
토피고 2D이하
단층 유(통과),유(2D≤)
유 인접
Total Fore-ploing
강관다단 대구경강관 조합 No. 3
(45.03) 55.88 38.24 5.88 0.00
%
68 38 26 4 0 n Total Fore-ploing
강관다단 대구경강관
조합 No. 1
100.00 40.40 34.44 18.54 6.62
%
151 61 52 28 10 n
본선구간
시공위치 신악터널 보조공법
Total Fore-ploing
강관다단 대구경강관
조합 No.28
(5.96) 77.78 22.22 0.00 0.00
%
9 7 2 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 29
(3.97) 66.67 33.33 0.00 0.00
%
6 4 2 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 30
(4.64) 100.00 0.00 0.00 0.00
%
7 7 0 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 31
(5.96) 66.67 33.33 0.00 0.00
%
9 6 3 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 32
(3.97) 100.00 0.00 0.00 0.00
%
6 6 0 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 33
(4.64) 57.14 14.29 28.57 0.00
%
7 4 1 2 0 n
Total Fore-ploing
강관다단 대구경강관
조합150 No. 34
(1.99) 33.33 66.67 0.00 0.00
%
3 1 2 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 39
(2.65) 50.00 50.00 0.00 0.00
%
4 2 2 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 40
(3.31) 80.00 20.00 0.00 0.00
%
5 4 1 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 41
(1.99) 100.00 0.00 0.00 0.00
%
3 3 0 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 42
(2.65) 25.00 25.00 50.00 0.00
%
4 1 1 2 0 n Total
Fore-ploing 강관다단 대구경강관 조합 No. 12
(14.57) 81.82 18.18 0.00 0.00
%
22 18 4 0 0 n
Total Fore-ploing
강관다단 대구경강관
조합 No. 13
(9.93) 80.00 20.00 0.00 0.00
%
15 12 3 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 14
(6.62) 50.00 30.00 20.00 0.00
%
10 5 3 2 0 n Total
Fore-ploing 강관다단 대구경강관
조합 No. 6
(31.13) 74.47 21.28 4.26 0.00
%
47 35 10 2 0 n
무 유 무 유
인접 인접
단층
무 유(통과),유(2D>)
인접 유(통과)
단층
유(2D≤) 무
100-41
RMR
40-21 20-0
무
유(통과) 단층
Total Fore-ploing
강관다단 대구경강관
조합 No.15
(6.62) 30.00 70.00 0.00 0.00
%
10 3 7 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 16
(3.31) 0.00 100.00 0.00 0.00
%
5 0 5 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 17
(3.97) 0.00 66.67 33.33 0.00
%
6 0 4 2 0 n Total
Fore-ploing 강관다단 대구경강관 조합 No. 35
(1.99) 66.67 33.33 0.00 0.00
%
3 2 1 0 0 n
Total Fore-ploing
강관다단 대구경강관 조합 No. 36
(4.64) 14.29 85.71 0.00 0.00
%
7 1 6 0 0 n Total
Fore-ploing 강관다단 대구경강관
조합 No. 7
(13.91) 14.29 76.19 9.52 0.00
%
21 3 16 2 0 n
20-0 토피고
2D이상 2D이하
RMR
100-41 40-21
갱구부 갱구부