Auxiliary reinforcement methods such as for-poling and multi-steel pipe grouting etc. are frequently used to avoid a possible collapse of tunnel face, where the ground condition is not favourable as well as geological formation is not sufficient. However, among those methods a suitable reinforcement method is exclusively decided by tunnel engineers experience so far.

Therefore, this study introduces a data-mining technique for the proper auxiliary reinforcement method during uncertainty of tunnelling work. The data-mining technique has widely been used in the field of social science, medical treatment, banking and agriculture etc. A decision-tree together with PDA technique based on tunnel construction data was developed to provide a reasonable reinforcement method in this study. Future study will be focused on the application of this technique in a variety of underground space developments.

(2)
(3)

신용상태 BAD 20%

GOOD 80%

25-35세 BAD 17%

GOOD 36%

35세 이상 BAD 3%

GOOD 44%

200만원이하 BAD 12%

GOOD 16%

200만원이상 BAD 4%

GOOD 20%

200만원이하 BAD 2%

GOOD 14%

200만원이상 BAD 1%

GOOD 30%

유 BAD 1%

GOOD 28%

무 BAD 0%

GOOD 2%

부모마디

자식마디

종단마디 나 이

월소득 월소득

신용카드 1 Depth

2 Depth

3 Depth

×

   

  

  

   

(1)

 

×   (2)

    

(4)

 

×

(3)

(5)
(6)

Total Fore-ploing

강관다단 대구경강관

조합 No. 4

(20.53) 32.26 48.39 12.90 6.45

%

31 10 15 4 2 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 2

(54.97) 27.71 31.33 28.92 12.05

%

83 23 26 24 10 n Total Fore-ploing

강관다단 대구경강관

조합 No. 1

(100.0) 40.40 34.44 18.54 6.62

%

151 61 52 28 10 n

시공위치 도심지터널

보조공법

Total Fore-ploing

강관다단 대구경강관

조합 No. 5

(34.44) 25.00 21.15 30.46 15.38

%

52 13 11 20 8 n

Total Fore-ploing

강관다단 대구경강관

조합 No.18

(0.66) 0.00 100.00 0.00 0.00

%

1 0 1 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 19

(0.66) 0.00 100.00 0.00 0.00

%

1 0 1 0 0 n Total Fore-ploing

강관다단 대구경강관

조합 No. 20

(4.64) 85.71 14.29 0.00 0.00

%

7 6 1 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 21

(11.92) 16.67 61.11 22.22 0.00

%

18 3 11 4 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 22

(2.65) 25.00 25.00 0.00 50.00

%

4 1 1 0 2 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 37

(1.99) 0.00 66.67 33.33 0.00

%

3 0 2 1 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 38

(9.93) 20.00 60.00 20.00 0.00

%

15 3 9 3 0 n Total

Fore-ploing 강관다단 대구경강관

조합 No. 8

(5.96) 66.67 33.33 0.00 0.00

%

9 6 3 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 9

(14.57) 18.18 54.55 18.18 9.09

%

22 4 12 4 2 n

100-41 40-21,20-0

RMR

40-21 RMR

20-0 100-41

2D이상

토피고

2D이하

Total Fore-ploing

강관다단 대구경강관 조합 No.23

(3.31) 80.00 0.00 20.00 0.00

%

5 4 0 1 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 24

(5.96) 44.44 22.22 22.22 11.11

%

9 4 2 2 1 n Total Fore-ploing

강관다단 대구경강관 조합 No. 25

(4.64) 0.00 14.29 57.14 28.57

%

7 0 1 4 2 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 26

(6.62) 30.00 20.00 40.00 10.00

%

10 3 2 4 1 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 27

(13.91) 9.52 28.57 42.86 19.05

%

21 2 6 9 4 n Total

Fore-ploing 강관다단 대구경강관 조합 No. 10

(13.91) 38.10 14.29 33.33 14.29

%

21 8 3 7 3 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 11

(20.53) 16.13 25.81 41.94 16.13

%

31 5 8 13 5 n

RMR

100-41 40-21,20-0

인접

40-21 RMR

20-0 100-41

2D이상

토피고 2D이하

단층 유(통과),유(2D≤)

인접

Total Fore-ploing

강관다단 대구경강관 조합 No. 3

(45.03) 55.88 38.24 5.88 0.00

%

68 38 26 4 0 n Total Fore-ploing

강관다단 대구경강관

조합 No. 1

100.00 40.40 34.44 18.54 6.62

%

151 61 52 28 10 n

본선구간

시공위치 신악터널 보조공법

Total Fore-ploing

강관다단 대구경강관

조합 No.28

(5.96) 77.78 22.22 0.00 0.00

%

9 7 2 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 29

(3.97) 66.67 33.33 0.00 0.00

%

6 4 2 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 30

(4.64) 100.00 0.00 0.00 0.00

%

7 7 0 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 31

(5.96) 66.67 33.33 0.00 0.00

%

9 6 3 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 32

(3.97) 100.00 0.00 0.00 0.00

%

6 6 0 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 33

(4.64) 57.14 14.29 28.57 0.00

%

7 4 1 2 0 n

Total Fore-ploing

강관다단 대구경강관

조합150 No. 34

(1.99) 33.33 66.67 0.00 0.00

%

3 1 2 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 39

(2.65) 50.00 50.00 0.00 0.00

%

4 2 2 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 40

(3.31) 80.00 20.00 0.00 0.00

%

5 4 1 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 41

(1.99) 100.00 0.00 0.00 0.00

%

3 3 0 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 42

(2.65) 25.00 25.00 50.00 0.00

%

4 1 1 2 0 n Total

Fore-ploing 강관다단 대구경강관 조합 No. 12

(14.57) 81.82 18.18 0.00 0.00

%

22 18 4 0 0 n

Total Fore-ploing

강관다단 대구경강관

조합 No. 13

(9.93) 80.00 20.00 0.00 0.00

%

15 12 3 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 14

(6.62) 50.00 30.00 20.00 0.00

%

10 5 3 2 0 n Total

Fore-ploing 강관다단 대구경강관

조합 No. 6

(31.13) 74.47 21.28 4.26 0.00

%

47 35 10 2 0 n

인접 인접

단층

유(통과),유(2D>)

인접 유(통과)

단층

유(2D≤)

100-41

RMR

40-21 20-0

유(통과) 단층

Total Fore-ploing

강관다단 대구경강관

조합 No.15

(6.62) 30.00 70.00 0.00 0.00

%

10 3 7 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 16

(3.31) 0.00 100.00 0.00 0.00

%

5 0 5 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 17

(3.97) 0.00 66.67 33.33 0.00

%

6 0 4 2 0 n Total

Fore-ploing 강관다단 대구경강관 조합 No. 35

(1.99) 66.67 33.33 0.00 0.00

%

3 2 1 0 0 n

Total Fore-ploing

강관다단 대구경강관 조합 No. 36

(4.64) 14.29 85.71 0.00 0.00

%

7 1 6 0 0 n Total

Fore-ploing 강관다단 대구경강관

조합 No. 7

(13.91) 14.29 76.19 9.52 0.00

%

21 3 16 2 0 n

20-0 토피고

2D이상 2D이하

RMR

100-41 40-21

갱구부 갱구부

(7)
(8)
(9)

참조

관련 문서