• 검색 결과가 없습니다.

2명 선발18

N/A
N/A
Protected

Academic year: 2022

Share "2명 선발18"

Copied!
1
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Within the months No. of weeks offered 1 AT-2020-4008LE 14D-MECHANICAL ENGINEERING 40C-CHEMISTRY, MATERIAL SCIENCE,

AND CHEMICAL ENGINEERING Lehrstuhl für Kunststoffverarbeitung, Montanuniversitüt Leoben 29-JUN-2020 - 25-SEP-2020 6-8(weeks) Austria 2020-02-22

2 BR-2020-906-EMP 11-COMPUTER AND INFORMATION SCIENCES Coopavel Cooperativa Agroindustrial 03-AUG-2020 - 31-DEC-2020 8-20(weeks) Brazil

3 CH-2020-000035 14C-ELECTRICAL AND ELECTRONICS ENGINEERING 40B-PHYSICS Empa 01-MAR-2020 - 31-DEC-2020 12-36(weeks)

4 CH-2020-000105 11-COMPUTER AND INFORMATION SCIENCES intelliCard Solutions AG 01-JUN-2020 - 31-JUL-2021 24-52(weeks)

5 CH-2020-000217 27-MATHEMATICS AND STATISTICS 40B-PHYSICS Institut for Information and Communication Technology de la HEIG-VD 01-AUG-2020 - 31-MAR-2021 22-26(weeks) 2020-02-22 6 CN-2020-SC-BB02 45-ECONOMICS AND SOCIAL SCIENCES 52-BUSINESS, MANAGEMENT,

AND MARKETING Star Charge 06-JUL-2020 - 30-SEP-2020 10-12(weeks) China

7 DE-2020-1007-10 14C-ELECTRICAL AND ELECTRONICS ENGINEERING TU Dresden 01-JAN-2020 - 31-DEC-2020 8-12(weeks)

8 DE-2020-1125-5 14D-MECHANICAL ENGINEERING Technische Universitaet Dresden 01-JAN-2020 - 31-DEC-2020 8-12(weeks)

9 DE-2020-1140-1 11-COMPUTER AND INFORMATION SCIENCES 14A-ENGINEERING, Other

14C-ELECTRICAL AND ELECTRONICS ENGINEERING TU Dresden 01-FEB-2020 - 15-DEC-2020 12-12(weeks)

10 DE-2020-1143-2 40C-CHEMISTRY, MATERIAL SCIENCE, AND CHEMICAL ENGINEERING Friedrich Schiller University Jena 01-JAN-2020 - 31-DEC-2020 4-12(weeks)

11 DE-2020-2000-14 04-ARCHITECTURE Anja Beecken Architekten 01-JUL-2020 - 30-SEP-2020 8-12(weeks)

12 DE-2020-2048-2 11-COMPUTER AND INFORMATION SCIENCES 26-BIOLOGICAL AND

BIOMEDICAL SCIENCES 27-MATHEMATICS AND STATISTICS econican GmbH 01-APR-2020 - 31-JUL-2020 8-16(weeks)

13 DE-2020-3002-1 14A-ENGINEERING, Other 14B-CIVIL ENGINEERING, GEOLOGY AND

MINING Van Oord Offshore Wind Germany GmbH 01-MAY-2020 - 30-APR-2021 12-24(weeks)

14 DK-2020-008 40A-PHYSICAL SCIENCES, Other 40C-CHEMISTRY, MATERIAL SCIENCE,

AND CHEMICAL ENGINEERING Other Haldor Topsoe A/S 01-JUN-2020 - 31-AUG-2020 8-13(weeks) Denmark 2020-02-22

15 ES-2020-0003 26-BIOLOGICAL AND BIOMEDICAL SCIENCES 40C-CHEMISTRY, MATERIAL

SCIENCE, AND CHEMICAL ENGINEERING AIMPLAS 01-SEP-2020 - 28-FEB-2021 24-52(weeks)

16 ES-2020-7852 52-BUSINESS, MANAGEMENT, AND MARKETING IDEATEC ADVANCED ACOUSTIC SOLUTIONS 07-JAN-2020 - 31-MAY-2021 24-52(weeks)

17 NL-2020-0001 11-COMPUTER AND INFORMATION SCIENCES 52-BUSINESS,

MANAGEMENT, AND MARKETING IXON B.V. 02-DEC-2019 - 30-JUN-2020 14-18(weeks) Netherlands 2명 선발

18 PL-2020-AGH027 26-BIOLOGICAL AND BIOMEDICAL SCIENCES AGH University of Science and Technology 01-OCT-2020 - 31-DEC-2020 4-4(weeks)

19 PL-2020-PRZ006 14B-CIVIL ENGINEERING, GEOLOGY AND MINING Rzeszow University of Technology, Dept of Building Structures 01-MAY-2020 - 31-JUL-2020 6-8(weeks) 20 RS-2020-1151 14A-ENGINEERING, Other 14D-MECHANICAL ENGINEERING 40C-

CHEMISTRY, MATERIAL SCIENCE, AND CHEMICAL ENGINEERING Key to Metals 14-SEP-2020 - 04-DEC-2020 8-12(weeks) Serbia

21 SE-2020-31-HOT 14C-ELECTRICAL AND ELECTRONICS ENGINEERING 40B-PHYSICS 40C-

CHEMISTRY, MATERIAL SCIENCE, AND CHEMICAL ENGINEERING Hot Disk 15-MAY-2020 - 31-DEC-2020 12-30(weeks) Sweden 2명 선발

22 TR-2020-006-YIL 11-COMPUTER AND INFORMATION SCIENCES 14A-ENGINEERING, Other

Other CRS Soft Yazilimm Hizmetleri A.S. 01-JUN-2020 - 31-AUG-2020 4-4(weeks) Turkey

23 UK-2020-SC-12 11-COMPUTER AND INFORMATION SCIENCES 27-MATHEMATICS AND

STATISTICS Children's University Scotland 24-MAY-2020 - 28-AUG-2020 or

06-APR-2020 - 03-JUL-2020 10-12(weeks) United Kingdom

Deadline 기타

Reference No. Faculty/Major Employer Internship Period

Country

Poland

2020-03-02 Switzerland

2020-03-02

Germany

2020-03-02

Spain

참조

관련 문서

Two months of doxorubicin-cyclophos- phamide with and without interval reinduction therapy compared with 6 months of cyclophosphamide, metho- trexate, and

In the subgroups of patients who had a previous AD history and survived more than three months, six months, and 12 months after acute deteriorating events, the mean

Each level of the SCORAD score in both the moderate (n=12) and severe groups (n=49) after 1 month, 2 months, 4 months and 6 months of cyclosporine treatment was significantly

(B, C, D, E) Follow-up radi- ographs showing the periapical status at 1 month, 3 months, 7 months, and 11 months, respectively. Lengthening and thickening of roots with

in 12 months). Furthermore, he showed that the VAS scores were significant higher at 12 months than at six months. Thus, they indicated limited long-term effects of the procedure

SGRI was increased statistically significantly from baseline to 3 months and 3 months(p<0.05) to 12 months(p<0.01) in both approach. From above mentioned results, we

to three groups based on their ages at first hospital visit (younger than 6 months, 7-12 months old, and 13-24 months old) to analyze whether there were dif- ferences

Generally, peaks in human JEV epidemics in China occur for 7–9 months each year, which varies geographically from 5–6 months in southernmost Hainan province, to 6–7 months