Project operator should make the protocol of land and goods after the completion
of survey on land and property(Article 7.2 of the Enforcement Decree of Land Compensation Act). After filling out the form of land protocol and goods, the sign or seal of landowner and relevant people should be obtained. (1)If landowner and relevant people refuse to give signature or sign without any reasonable cause or (2) if obtaining signature or seal is not possible as landowner and relevant people cannot be identified or there is no information on the address or location where they live, the reason for it should be written in the protocol of land and list of on-the-ground goods.
[Attached Paper No.4 Form]
Protocol of Land(A : Front Page)
Type and Name of Public Works Basis for Project Approval and
Announcement Date Project
operator
Name or Title Address Landowner Name or Title
Address Details of Land
Location Lot Number (Initial Lot Number)
Land Category
Current Use of the Land
Whole Area
Included Area
Specific Use Area
Relevant People
Remarks Name or
Title Address
Type and Details of Rights
Reasons for rejecting signing or sealing on this paper or reasons for not being able to sign or seal Other information required for the
estimation of compensation
The protocol of land is filled out as above under Article 14.1 of Act on Acquisition of and Compensation for Land, Etc. for Public Works and Article 7.3 of its Enforcement Decree.
Date, Month, Year
project operator Seal landowner (Sign or Seal)
Relevant People (Sign or Seal) ※ How to Fill Out the Form
1. This form should be filled out by each landowner.
2. If land is divided due to the public works, the lot number before division should be filled in
"lot number(initial lot number)" field.
3. In the "relevant people" field, the people who has the right to the land excluding ownership should be written.
4. If the area in cadastral record and actually measured area are different, put area in the cadastral record into "remarks" field.
5. In case of road site, the characteristics of the road including type, current use and location should be written in "remarks"field along with other information.
210mm×297mm
(plain paper 60g/㎡(recycled))
Protocol of Land (B : Back Page)
Project Name
Location
Lot Number
Parent Number :
Area
Area before Division :
Inclusion Number : Included Area :
Land Category On Public Record:
Actual State :
Crop being Cultivated
Owner Address : Name :
Farmer Address : Name :
Other People with
Right Type Address
Map of Inclusion (sketch map) Photograph Mount
Special Note
Confirmation of Crop Head of Village Seal
[Attached Paper No. 5 Form]
Protocol of Goods (A : Front Page)
Type and Name of Public Works Basis for Project Approval and
Announcement Date Project
operator
Name or Title Address Property
Owner
Name or Title Address Details of goods
Location Lot Number
Type of Property
Structure and Size
Quantity (Area)
Relevant People
Remarks Name
or TitleAddress Type and Details of Rights
Reasons for rejecting signing or sealing on this paper or reasons for not being able to sign or seal
Other information required for the estimation of
compensation
goods is filled out as above under Article 14.1 of Act on Acquisition of and Compensation for Land, Etc. for Public Works and Article 7.4 of its Enforcement Decree.
Date, Month, Year
project operator Seal Property Owner (Sign or Seal) Relevant People (Sign or Seal) ※ How to Fill Out the Form
1. This form should be filled out by each property owner.
2. If a part of the building is included, the included area should be written in "quantity(area)" field and floor area should be written in "remarks" field.
3. In the "relevant people" field, the people who has the right to the property excluding ownership should be written.
4. If the area in cadastral record and actually measured area are different, put area in the cadastral record into "remarks" field.
210mm×297mm
(plain paper 60g/㎡(recycled))
Protocol of Goods (B: Back Page)
Serial Number
ㅇConstruction Name: Written on : 200 . . .
Location of Property STA. Owner Address :
Name :
Building
No. Purpose Material Used Size Layout of goodss
Other goodss
No. Type Size Quantity No. Type Size Quantity
Good Will
IndustryPermission Y/N
Business Size
Residence
No. of Household :
Head of House hold
Residential Building
No. of People Living in House hold
Owner Sign Head of Village Sign
※ Attach the photo of each property
※ Attach relevant record including building register and taxation register
※ If owner refuses to confirm the information, the information should be checked by the head of the village.
Building Register Surveyed Map Comparison between Building Register and Actual Area
Photograph
Location:
chapter 4
Preparation for
Compensation
C | H | A | P | T | E | R | 0 4
Preparation for Compensation
1. Announcement and Reading of Compensation Plan
Announcement of compensation plan is to inform the preparation of compensation to the landowner. Major items related to the date of compensation announcement are as follows. Therefore, holding of compensation council and confirmation of appraiser recommended by landowner should be completed in advance to prevent civil claim related to short period of notice. If there many goods omitted in the process of adjudication, the consultation may be regarded as insincere consultation delaying adjudication. Therefore, the reading of land protocol and goods by owner should be done sufficiently to prevent objection by landowner due to omitted property.
Article 44.4 of Enforcement Decree of Land Compensation Act : Governor of special province, mayor or head of county or province or project operator should install compensation council within 30 days after the expiration of reading period of compensation plan and the installation of the consultation should be notified. The compensation council should be established within 44 days after the date of compensation plan announcement(reading period is 14 days and within 30 days after the expiration of reading period).
Article 28 of Enforcement Decree of Land Compensation Act : If landowner
wants to recommend appraiser, he should notify his intention to recommend appraiser to project operator within 30 days after the expiration of reading period.
Article 44.3 of Enforcement Rule of Land Compensation Act : Those who obtained fishing rights after the date of compensation plan announcement(under this article, it means the notification of compensation plan to landowner and relevant people) or the date of project approval announcement under Article 22(hereinafter referred to as "project approval date, etc.") are not subject to compensation for fishery.