vapor removal channel (groove)
eva. cond.
compensation chamber.
wick [side view]
liquid
vapor
1529
Heater Insulating material : Thermocouple
T P
T P
Data logger PC
Flowmeter Variable temperature
water circulation bath
Power supplier T P /
: Pressure sensor
1 9 10 11 12
~ 13 14
15 16
17 18 19 20 22 21
23
Row Sives 배합
성 형
(500 - 3000 kgf/ ㎠)
1차 소결(예비소결)
(400 - 500 ℃, 5-10 min.)
2차 소결(본소결)
(700 - 900 ℃, 20-60 min.)
후처리
(가공및 세척등)
Time(sec)
0 2000 4000 6000 8000
Temperature(oC)
10 20 30 40 50 60 70 80
T_heat_avg vapor10 vapor11 vapor12 vapor13 cond15 cond16 cond17
Working point Heating point
Water(30cc)
Qin = 30 (W), Tcwin = 20 (oC)
1531
Time(sec)
4000 5000 6000 7000 8000
Q(W)
0 20 40 60 80 100
Q input Q actual Water(30cc)
Qin = 30 (W), Tcwin = 20 (oC)
Water, Tcwin=20(oC)
Qeva (W)
20 30 40 50 60 70 80
R (o C / W)
0.5 1.0 1.5 2.0 2.5
30cc 40cc