Steam Generator
Design 2 Months
Basic Design - Performance - Component Analysis General Arrangement Pressure Part Arrangement Component Detail Design
Material Procurement
2.5 Months
Fin Tube Header Link Drum Casing Duct Insulation Auxiliary Equipment
Shipping Erection Bottom
Shop Fabrication Harp Ass’y 4.0 Months Module Ass’y 4.5 Months
Hydro Test Final Inspection
Top
Bending & Welding Storage
Marking & Cutting Finning
The Core of DOOSAN module system ("COTHMOS") is an integrated design program developed by the company for basic engineering and computer designed component details.
COTHMOS integrates the HRSG engineering programs of thermal performance design, component design, flexibility analysis, noise evaluation, dynamic behavior and so on. It also automatically provides two dimensional Auto-Cad detail drawings and the bill of materials based on three dimensional pressure part arrangement drawings as well as three dimensional general arrangement drawings.
Core of DOOSAN HRSG Module System
COTHMOS
▶
▶Design Flow
BASIC Design
Analysis
FINTUBE·Heat Transfer ·Stress/Flexibility
·Structure ·Noise
·Fluent ·Dynamic Behavior HEADER
LINK DRUM CASING DUCT INSULATION
P & ID
Computerized Drawings
Drum. exe Header. exe
Stack. exe Duct. exe
Insul. exe
Formod. exe Hrsgsim. exe
Natbm. exe Circ. exe
2D AUTO DWG & BOM
for Pressure Parts
Performance
Components
PPA 3D Modeling
DESIGN
PRODUCTION LEAD TIME
Harp Ass’y Module Ass’y
GA 3D Modeling
DH0511/H Doosan Hydro Technology, Inc.
9001 Brittany Way Tampa, Florida 33619, USA Tel. 1-813-549-0182, Fax. 1-813-549-0183 Doosan Heavy Industries & Construction Co., Ltd.
www.doosanheavy.com Seoul office
1303-22, Seocho-Dong, Seocho-Gu. Seoul 137-920, Korea (C.P.O Box 1826, Seoul Korea)
Tel. 82-2-2-513-6114, Fax. 82-2-513-6200 Head office and Changwon plant
555, Guigok-dong, Changwon, Gyeongsangnam-do, 641-792, Korea Tel. 82-55-278-6114, 7114 Fax. 82-55-264-5551,5552
GLOBAL NETWORK
Doosan Heavy Industries America Corp.
400 Kelby Street, Parker Plaza, 10th fl.
Fort Lee, NJ 07024, USA Phone : 1 201 944 4554 Fax : 1 201 944 5022/ 5053
Doosan Heavy Industries Japan Corp.
Room2410,Mita Kokusai BLD.1-4-28, Mita Minato-ku, Tokyo, Japan 108-0073 Phone : 81 3 3452 5451~3
Fax : 81 3 3452 5624 Windsor Office
Westinghouse Electric, 20 International Drive, Windsor, CT 06095, USA (Windsor, Schenectady)
Phone : 1 860 731 6479 Fax : 1 860 731 6478 Schenectady Office
Room 33-202A, General Electric Bldg, One River Road, Schenectady, NY 12345, USA (Windsor, Schenectady)
Phone : 1 518 385 5218 Fax : 1 518 385 4984 Beijing Office
19F, Tower B Gateway Plaza, No. 18 Xiaguangli,
North Road, East Third Ring, Chaoyang District, Beijing 100027 Phone : 86 10 8454 7131~33
Fax : 86 10 8484 7139 Shanghai Office
Room 2802. City Center of Shanghai Bldg.,100 Zunyi Rd, Changning District Shanghai 200051, China
Phone : 86 21 6237 2485/2486 Fax : 86 21 6237 2487 Taipei Office
Room 704, No.51, Keelung Road Section 2, Taipei 110, Taiwan
Phone : 886 2 2739 2255(ARS) Fax : 886 2 2739 2266 Hanoi Office
#1101, Daeha Business Center, 360 Kim Ma, Ba Dinh District, Hanoi, Vietnam Phone : 84 4 273 0545~8 Fax : 84 4 273 0550 Bangkok Office
10th Floor, M-thai Tower, Wireless Road, Bangkok, Thailand
Phone : 66 2 654 0690~2 Fax : 66 2 654 0693 New Delhi Office
2A, 2nd Floor, Lotus Towers, Community Centre, New Friends Colony, New Delhi-110 065, India
Phone : 91 11 4132 8031 Fax : 91 11 4132 8039 Mumbai Office
1109&1110, 11th Floor, Maker Chambers-V, Nariman Point, Mumbai 400021, India Phone : 91 22 2202 6504 Fax : 91 22 2202 6557 Dubai Office
Office No. 308, Al Serkal Building, Airport Road PO Box 11859, Dubai, UAE (Dubai, Abu Dhabi)
Phone : 971 4 294 4699 Fax : 971 4 294 9930
Abu Dhabi Office
Al Ghaith Tower 5th Floor, Room 508, Hamdan Street, P.O. Box 27767, Abu Dhabi, UAE (Dubai, Abu Dhabi)
Phone : 971 2 627 6273 Fax : 971 2 627 6274 Riyadh Office
P.O.Box 9656, Riyadh 11423, Saudi Arabia Phone : 966 1 419 1920/1696 Fax : 966 1 419 1995 Kuwait Office
Villa 15, Street 24, Block 4, Sabah Al-Salem Area, Kuwait Phone : 965 551 8452/8436 Fax : 965 551 8453
Frankfurt Office
Frankfurt Office 9th Floor, Arabella Center, Lyoner Strasse 44-48, 60528 Frankfurt am Main, Germany
Phone : 49 69 69 5004 0 Fax : 49 69 69 5004 10 Tripoli Office
Phone : 971 50 459 2759 / 218 91 380 8021
MAJOR SUBSIDIARIES
Doosan Babcock Energy Limited 11 The Boulevard, Crawley West Sussex, United Kingdom RH10 1UX
Phone : 44 1293 584 990 Fax :44 1293 584 918 Doosan Heavy Industries Vietnam Co., Ltd.
[Doosan Vina]
No.1 An Duong Vuong Street, Quangngai City, Quangngai Province, Vietnam Phone : 84 55 713 001~7 Fax : 84 55 713 008
Doosan IMGB
104 Berceni Road, Bucharest 4, Romania Phone : 40 21 301 2602 Fax : 40 21 301 2502 Doosan Engineering & Services India Pvt. Ltd.
3rd Floor DLF Building No. 8, DLF Cyber City Phase -•±, Gurgaon Haryana (122-002), India Phone : 91 124 439 8200
Fax : 91 124 414 7006
Doosan Hydro Technology, Inc.
9001 Brittany Way Tampa, Florida 33619 Phone : 1 813 549 0182 Fax : 1 813 471 0713 Doosan HF Controls Corp.
16650 Westgrove Drive, Suite 500 Addison, Texas 75001, USA
Phone :1 972 367 4657 Fax : 1 972 367 4699
Ceylon Heavy Industries & Construction Co., Ltd. [CHICO]
Oruwala Athurugiriya Sri Lanka Phone : 94 114 440031 2 Fax : 94 114 440030 Hanjung Power Ltd.
P.O.Box 2803, Boroko, NCD Papua New Guinea Phone : 675 320 0529 Fax : 675 321 2984
Han-Viet Heavy Industry & Construction Corp. [HANVICO]
933 Ton Duc Thang Street, Hong Bang District, HaiPhong, Vietnam Phone : 84 31 371 2710 Fax : 84 31 712 714/715
INTRODUCTION
▲SEOINCHON C.C.P.P. #1, 2, 3, 4
Established in 1962, Doosan Heavy Industries & Construction
Co., Ltd. (DOOSAN) has played major roles in the development of Korea's power plant business with the cutting edge technology and high-caliber production facilities.
DOOSAN has extensive experience in supplying equipment for various types of power plants. DOOSAN has its own HRSG shop with a prodution capacity over 39 units per year. In particular, it has supplied over 150 units of HRSG for combined cycle power plants around the globe.
DOOSAN has continually been engaged in research and development on the Heat Recovery Steam Generator ("HRSG"). The R&D center has been
developing once-through technology, which will be applied to higher efficiency combined cycle power plant.
Meanwhile, DOOSAN has received 12 certificates of authorization from the ASME, allowing the company to use the ASME Code stamp for components, In addition, the company was awarded ISO 9000 series and ISO 14000 certifications for all its power plants components including the HRSG.
▲ESSAR C.C.P.P 515MW
Vertical gas flow with forced circulation in top supported type as well as horizontal gas flow, natural circulation bottom/ top supported type is composed of shop maximum assembled modules, properly braced for shipment and lifting in the field.
Large drums ensure proper steam purity and reduce water surge during start-up.
Heat transfer is achieved through extended surface spiral fins welded to the tubes. Generating tubes are rolled in module headers.
Standard headers for the economizers and superheaters provide uniform parts and shorter lead time.
The tubing is strength welded to these headers for increased reliability.
Multiple steam pressure available; single, double and triple pressure range.
(high, intermediate, low pressure)
FEATURE
MAJOR COMPONENTS
Optional Equipment
Vertical Type
- Duct Burner For Supplemental Firing - Selective Catalystic Reduction System (SCR)
- CO Catalyst - Exhaust Silencer
- Bypass Dampers and Stack - Expansion Joints, Piping, Deaerators, etc.
- Control System
Horizontal Type
1 2
3 4 5
6
8 9
16 14 15 13 12 11
10
7
1
4 6
18 17
19 20
21
7
8 9
11 12
10 13 14 5
2
16
3 15
❶ ByPass Stack
❷ Exhaust Stack
❸ Sliencer for HP Steam Line
❹ Sliencer for LP Steam Line
❺ Sliencer for Blow Down Tank
❻ Sliencer for LP Drum
❼ Slincer for HP Drum
❽ LP Drum
❾ HP Drum
❿ Seal Air Fan Unit Inlet Duct Blow Down Tank LP Circulation Pump (B) LP Circulation Pump (A) HP Circulation Pump (B) HP Circulation Pump (A)
❶ Stack
❷ HP Drum
❸ IP S/H & Drum
❹ LP Drum
❺ Deaerator
❻ Reheat Sky Vent Silencer
❼ HP STM Start-Up Silencer
❽ Reheat Inlet S/V Silencer
❾ HP Drum 2 Silencer
❿ LP STM Silencer LP Drum 1 Silencer IP Drum 1 Silencer IP STM Silencer IP Drum 2 Silencer LP Drum 2 Silencer Duct IP Drum 1 Silencer IP Sky Vent Silencer Reheat Outlet S/V Silencer HP Drum 1 Silencer (21) F/W Heater ReCIR. Pump
HP System IP System LP System S/V Exhaust Line PPA
HRSG Experience 1) DOMESTIC
CLIENT PROJECT GT TYPE WORK PERIOD
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
HANWHA ENERGY CO., LTD.
(KOREA)
HANWHA ENERGY CO., LTD.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
HANWHA ENERGY CO., LTD.
(KOREA)
HANWHA ENERGY CO., LTD.
(KOREA) POSCO (KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
LG / SIEMENS (KOREA)
KOREA ELECTRIC POWER CORP.
(KOREA)
KUNSAN CC POWER PLANT YUNGWOL CC POWER
PLANT SEOINCHON
CC #1,2 POWER PLANT
PYONGTAEK POWER PLANT ILSAN CC POWER
PLANT PUCHON CC POWER
PLANT SEOINCHON
CC #3,4 POWER PLANT BUNDANG CC #2
POWER PLANT HANLIM CC POWER PLANT
HEC NO.1 REPOWERING
HEC NO.2 REPOWERING
ILSAN CC POWER PLANT
(EXTENSION) ULSAN CC POWER
PLANT
PORYONG CC POWER PLANT
ULSAN NO.1 REPOWERING
HEC NO.3 CC POWER PLANT
HEC NO.4 CC POWER PLANT POSCO POHANG CC
POWER PLANT
PUSAN CC POWER PLANT
LG-IPP CC POWER PLANT
INCHEON
GE MS7B
GE MS7B
GE PG7E
GE MS7EA
WH 501D5
WH 501D5
GE PG7FA
ABB GT11N2
GE MS6B
WH 501D5
WH 501D5
WH 501D5
WH 501F
ABB GT24
WH 501D5
WH 501D5
WH 501D5
ABB GT11N2
GE 7FA
SIEMENS V84.3
SIEMENS V84.3
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE BOP PACKAGE
HRSG PACKAGE BOP PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE BOP PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE HRSG, BOP
PACKAGE STEAM TURBINE
PACKAGE
HRSG PACKAGE
HRSG PACKAGE
76. 11 - 78. 07
76. 11 - 78. 07
90. 05 - 92. 12
92. 07 - 95. 06
93. 05 - 95. 04
93. 05 - 95. 04
94. 10 - 97. 06
94. 10 - 96. 03
95. 11 - 97. 06
95. 12 - 97. 06
95. 12 - 97. 12
96. 01 - 97. 05
96. 01 - 97. 06
96. 04 - 00. 06
96. 11 - 98. 06
97. 11 - 99. 01
97. 11 - 99. 01
97. 10 - 01. 02
00. 09 - 02. 03
98 . 11 - 01. 06
03.05 – 04.08 94 X 4 UNIT
94 X 4 UNIT
425.7 X 8 UNITS (171.7, 200, 35.8,
18.2) 159 X 4 UNITS
(128, 24, 7)
224.1 X 4 UNITS (169.3, 54.8) 224.1 X 3 UNITS
(169.3, 54.8) 438.1 X 8 UNITS (174.4, 202.4, 36.8,
26.4) 164.5 X 3 UNITS
(127.8, 36.7) 69.9 X 2 UNITS
(61.9, 8) 312.5 X 3 UNITS (116.3, 140, 25.9,
30.3) 312.5 X 3 UNITS (116.3, 140, 25.9,
30.3) 224.1 X 2 UNITS
(169.3, 54.8) 472.2 X 4 UNITS (216.3, 200, 27.9,
28.0)
436.5 X 8 UNITS (187.5,203.6,23.6,21.8)
204.2 X 2 UNITS (166.7, 37.5) 323.4 X 3 UNITS (123.9, 146.8, 27.4,
25.3) 323.4 X 3 UNITS (123.9, 146.8, 27.4,
25.3) 200.3 X 2 UNITS
(160.6, 39.7)
458.9 X 8 UNITS (182,212.8,38.1,26.0)
455.2 X 2UNITS (178.9, 212.0,40.3,
24.8)
463.8 X 2UNIT (182.6,216.4,42.8,22)
63.5
63.5 100 23 25.5
4 92 23 9 92
8 92
8 125
25 27.5
3 65
4 61 10.8 90.2 30.6 32.0 3.5 90.2 30.6 32.0 3.5
92 8 129 35.1 36.5 4.5 106 25.7 28.5 3.5 60.2
8.0 108.0
31 32.4
5.8 108.0
31 32.4
5.8 73.9
4.6 131.5
26.6 29.0 4.2 133.0 29.4 31.5 3.8 135 27 29 4
427
427 542.3 542.3 287.6 252.9 498 256 207 505 SAT 505 SAT.
558 558 325 274 499 153 507 226 484 484 347 138 484 484 347 138 505 SAT 540 540 347 262 568 568 313 SAT 433 SAT 505 505 317 233 505 505 317 233 506 275 567.7 567.7 324.3 274.2 545.0 545.0 332.0 235.4 568 565 334 239
WORKING P.@
SHO (kg/㎠ ㎠g) CAPACITY
TON/HR x UNITS
WORKING T.@
SHO(℃ ℃ )
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
DUBAI ELECTRIC CORP. (U.A.E)
ESSAR POWER CORP.
(INDIA)
KPCL (INDIA)
MYANMAR ELECTRIC POWER ENTERPRISE (MYANMAR)
FIRST ENERGY / SIEMENS (PHILLIPPINES)
ENRON / SIEMENS (BRAGIL)
CMS / SIEMENS (UAE)
SCOTTISH HYDRO- ELECTRIC / SIEMENS (SCOTLAND) H.P. / PARSONS POWERGROUP INC.
(CROATIA) ISAGEN / PARSON (COLOMBIA)
GREAT YAMOUTH LTD., / GE (ENGLAND)
AES /
WESTINGHOUSE (USA)
EMPRESAS PUBLICAS DE MEDELLIN E.S.P / GE (COLUMBIA) HSIN TAO POWER CORPORATION / GE (TAIWAN)
LAEM CHABANG POWER / FORTUM (TAILAND) ELECTRICITY OF VIETNAM (EVN)
I.P.D.C. / MAPNA (IRAN)
JABEL ALI POWER PLANT
ESSAR 500MW POWER PLANT
KPCL CC POWER PLANT
MYANMA CC POWER PLANT
SANTA RITA 1000MW CCPP
CUIABA CC POWER PLANT
AL-TAWEELHA A2
PETERHEAD CC POWER PLANT
TETO ZAGREB CC POWER PLANT
TERMOCENTRO
GREAT YARMOUTH
IRONWOOD CC POWER PLANT
EPM LA SIERRA CC POWER PLANT
EVERGREEN - HSIN TAO POWER PLANT
LAEM CHABANG POWER PLANT
BARIA Ⅱ POWER PLANT
FARS
AEG PG9E
GE PG9E
ALSTHOM 9E
GE 6B
SIEMENS V84.3A
SIEMENS 84.3
SIEMENS V94.3
SIEMENS V94.3A
GE 6FA
WH 501D
GE 9FA
WH 501G
GE 7FA
GE 7FA
GE 6B
GE 6B
GE 9E
TURNKEY CONTRACT (supplementary firing) HRSG, BOP PACKAGE STEAM TURBINE
PACKAGE
HRSG PACKAGE
HRSG MODULES
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE, GAS TURBINE
HRSG PACKAGE
HRSG PACKAGE BOP PACKAGE
86. 02 - 88. 10
94. 04 - 95. 11
97. 10 - 00. 12
95. 06 - 96. 03
97. 12 - 2000. 09
98. 02 - 2000. 05
98. 11 – 2001. 06
98. 06 - 00. 02
98. 12 - 00. 10
99. 01 - 00. 01
99. 01 - 01. 01
99. 02 – 99. 12
99. 03 – 00. 11
99. 06 –00.04
99. 10 – 01. 06
99. 11 – 00.11
00.01 – 01.01 250 X 3 UNITS
(250)
210.4 X 3 UNITS (176.2, 34.2)
227.4 X 2 UNITS (185.9,26.2,15.3)
48 X 6 UNITS (48.0)
479.4 X 4 UNITS (198.2, 222.9, 39.9,
18.4)
433.3 X 2 UNITS (179.7, 201.5, 29.0,
23.1) 600 X 3 UNITS
(600) 664.5 X 3 UNITS (287.0, 311.5, 36.0,
30.0)
122.4 X 2 UNITS (108.9, 13.5)
177.8 X 2 UNITS (145.2, 32.6)
684 X 1 UNIT (287.0, 317.6, 39.0,
40.4)
615.3 X 2 UNITS (238, 285.8, 57.3,
34.2)
461.3 X 2 UNIT (184.0, 211.6, 33.4,
32.3) 387.2 X 3UNITS (165. 180.8, 22.4,
19.0)
75.1 X 2UNITS (64.2, 10.9)
74.5 X 3UNITS (62.3, 12.2) 179.9 X 6UNITS
(144.7, 35.2)
11
79.5 5.3
90.2 19.4 3.9
52.0
111.3 29 31.5
3.9 110.7
29.0 31.5 3.9
74
137.0 39 40 5.3 96.1 10.8
92.3 11.9 100.7
21.7 23.7 3.1 125 34.0 36.4 3.4 128.2
23.7 28.1 4.3 121.1
21.0 22.6 4.8
73.9 12.6
73.4 6.4
89.7 6.4
SAT
525 210.4
513 291 181.8
510
540 540 325 235 550 550 320 234.7
522
540 540 325 240 540 285
513 295 567 567 312 256 568 568 272 268 567 566 322 317 567.7 567.7 312.0 309.0 511.4 286
512 213
512 229
CAPACITY TON/HR x UNITS
WORKING P.@
SHO (kg/㎠ ㎠g)
WORKING T.@
SHO(℃ ℃ )
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
LA COMPANIA DE ELECTRICIDAD / SIEMENS CEYLON ELECTRICITY BOARD (CEB) / TPK
SARGENT & LUNDY AND ZACHARY
TAMPA ELECTRIC COMPANY (USA)
TAMPA ELECTRIC COMPANY (USA)
BECHTEL (MEXICO)
GE (MALAYSIA)
GE (SPAIN)
SARGENT & LUNDY (USA)
SIEMENS (MALAYSIA)
GE (MEXICO)
UAE OFFSET GROUP (UAE)
PARSONS (USA)
GE (BRAZIL)
SANPEDRO
KELANITISSA CCPP
CORPUS CHRISTI
TECO BAYSIDE POWER PLANT
TECO BAYSIDE POWER PLANT (Extension)
LAROSITA
SKS
CASTEJON
SANDHILL
PANGLIMA
ALTAMIRA
FUJAIRAH
CHEHALIS
THERMOPERNANBUCO
SIEMENS 64.3A
GE 9E
GE 7FA
GE 7FA
GE 7FA
WH 501FD
GE 9FA
GE 9FA
GE 7FA
V94.3A
GE 7FA
GE 9E
GE 7FA
GE 7FA
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
00.02 - 01.09
00.06 – 01.03
00.06 – 01.07
00.06 – 04.05
00.10-04.05
00.11 – 01.07
00.12 – 01.12
01.01 – 01.12
01.03 – 02.06
01.03 – 02.12
01.03 – 02.06
01.06– 03.06
01.07 – 02.04
01.07 – 02.11 130.3 X 3UNITS
(117.0, 13.3) 221.7 X 1UNIT
(185.8, 35.9) 461.3 X 2UNITS (184, 211.6, 33.4,
32.3)
477.7 X 3UNITS (207, 226, 23.8, 18.9)
477.7 X 3UNITS (207, 226, 23.8, 18.9)
477.7 X 3UNITS (207, 226, 23.8, 18.9)
479.8 X 3UNITS (185,224,37,33.8)
656 X 1UNITS (282, 303, 33, 38)
648 X 1UNIT (278,297,36,37)
425.6 X 1UNIT (188.3,184.2,33.9,
19.2)
658.9 X 2UNITS (267,307.2, 48.7,36)
514 X 4UNIT (222, 243, 22, 27)
313.6 X 4UNITS (313.6) 466.1 X 2UNITS (188.2,220.8, 34.3,
22.8)
551 X 2UNIT (246,267, 17, 21)
82.2 4.0 74.3
6.3 128.2
23.7 28.1 4.3 107 37.7 39.6 9 107 37.7 39.6 9 107 37.7 39.6 9 131 29.4 31 4.5 99 23 24 4.1 95 23 24 4.1 72.1 11.8 13.8 1.1 135.9
31.5 32.8 5.2 114 27.5 29.5 4.9
65
112.5 23.8 25.7 4.6 132.2
31 36 4.9
542 200 511.4 214.8 567 566 322 317 543.3 543.3 312.8 235.5 543.3 543.3 312.8 235.5 543.3 543.3 312.8 235.5 568 568 319 317 567 567 298 295 567 567 298 295 568 568 287 240 568 565 335 240 567 567 309 307 532.4
566 565 318 316 567 567 322 320
CAPACITY TON/HR x UNITS
WORKING P.@
SHO (kg/㎠ ㎠g)
WORKING T.@
SHO(℃ ℃ )
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
HYUNDAI (BRAZIL)
SIEMENS (VIETNAM)
ENEL POWER (QATAR)
TOSHIBA (TAIWAN)
SIEMENS (ISRAEL)
SIEMENS (SPAIN)
GE (SPAIN)
SIEMENS (ISRAEL)
SIEMENS (SPAIN)
SIEMENS (SPAIN)
GE (SPAIN)
GE (SPAIN)
CEGCO (JORDAN)
THERMONORTE
Phu My III CCPP
RAS LAFFAN
CHIAHUI
GEZER / HAIFA
GIBRALTAR
AMOREVIETA
HAIFA 3
PALOS
PALOS (Extension)
SABON
ACECA
REHAB
GE 7EA
V94.3A
GE 9E
GE 7FA
V94.3A
V94.3A
GE 9FA
V94.3A
V94.3A
V94.3A
GE9FA
GE9FA
GE9E
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE (supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
01.08 – 02.06
01.10 – 02.09
01.10 – 03.02
01.11 – 02.10
02.01 –
02.03 –
02.05 –
02. 11–
02. 02–
03. 01– 04.12
03. 01– 04.02
03. 01– 04.02
03.06-04.06 122.8 X 3UNITS
(122.8)
660 X 2UNITS (279,311,26,44)
384.1 X 4UNITS (384.1)
442 X 3UNITS (184,212,32,14)
666 X 3UNITS (265,311,51,39)
634 X 2UNITS (288,264,46,36)
664.4 X 2UNITS (266.6,314.9,49.7,33.2)
665 X 1UNITS (265,311,51,38)
683.8 X 2UNITS (278.3,320.9,48.2,36.4)
683.8 X 1UNITS (278.3,320.9,48.2,
36.4)
675.5 X 1UNIT (282.7,312,39.6,41.2)
675.5 X 1UNITS (282.7,312,39.6,41.2)
190.6 X 2UNITS (160, 30.6)
91.5
116.1 29.6 30.9 4.7
96.3
132.5 31.6 34.2 6.1
131.4 30.1 31.4 3.65
126.2 25.3 26.6 6.6
124 24.8 27.3 5.3
131.4 30.1 31.4 3.65
121 30.6 32.7 3.8
121 30.6 32.7 3.8
99.2 23.0 25.0 5.1
99.2 23.0 25.0 5.1
104 15.5
502
551.2 550.3 322.8 237.3
567.0
538.3 537.5 325.0 295.7
567.4 550.2 331.5 236.8
540 550 325 235
566.9 566.3 314.1 309.6
567.4 550.2 331.5 236.8
538.3 550.0 328.2 239.7
538.3 550.0 328.2 239.7
566.7 566.1 300.6 297.8
566.7 566.1 300.6 297.8
518 260
CAPACITY TON/HR x UNITS
WORKING P.@
SHO (kg/㎠ ㎠g)
WORKING T.@
SHO(℃ ℃ )
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
SIEMENS (SAUDI)
TOSHIBA (UAE)
TOSHIBA (UAE)
MAPNA (IRAN)
MARUBENI (VIETNAM)
DAEWOO E&C (LIBYA)
SGCC (OMAN)
HYUNDAI E&C (LIBYA)
AL JUBAIL
JEBEL ALI
UMM AL NAR
MAPNA
PHYMY 2.1 EXT. ADD-ON
BENGHAZI
SOHAR
ZAIWA
WH501DA
GE9FA
GE9FA
WH701D
GE9E
V94.2
V94.2
GT13E
V94.2
GT13E
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
03.06-05.01
03.07-04.05
03.07-06.06
03.07-04.05
03.07-04.10
03.07-07.10
03.12 – 05.01
04.03 – 05.02
04.09 – 05.10
04.10 – 05.10 255 X 2UNITS
(255)
720 X 3UNITS (720)
580 X 5UNITS (580)
273.6 X 2UNITS (241.2, 32.4)
273.6 X 2UNITS (241.2, 32.4)
273.6 X 40UNITS (241.2, 32.4)
274.2 X 2UNITS (211.2,34.3,28.7)
269 X 4UNITS (220,49)
453 X 3UNITS (395,58)
267 X 4UNITS (218,49)
51
95
89.4
90.6 8.4
90.6 8.4
90.6 8.4
101.9 24.3
3.8
83.6 5.1
88.7 3.6
92.6 9.6
402
562
569
520 233
520 233
520 233
532 533 150
512 262
543 246
513 276