(1)

Heat Recovery

Steam Generator

Heat Recovery

Steam Generator

(2)
(3)

Design 2 Months

Basic Design - Performance - Component Analysis General Arrangement Pressure Part Arrangement Component Detail Design

Material Procurement

2.5 Months

Fin Tube Header Link Drum Casing Duct Insulation Auxiliary Equipment

Shipping Erection Bottom

Shop Fabrication Harp Ass’y 4.0 Months Module Ass’y 4.5 Months

Hydro Test Final Inspection

Top

Bending & Welding Storage

Marking & Cutting Finning

The Core of DOOSAN module system ("COTHMOS") is an integrated design program developed by the company for basic engineering and computer designed component details.

COTHMOS integrates the HRSG engineering programs of thermal performance design, component design, flexibility analysis, noise evaluation, dynamic behavior and so on. It also automatically provides two dimensional Auto-Cad detail drawings and the bill of materials based on three dimensional pressure part arrangement drawings as well as three dimensional general arrangement drawings.

Core of DOOSAN HRSG Module System

COTHMOS

▶Design Flow

BASIC Design

Analysis

FINTUBE

·Heat Transfer ·Stress/Flexibility

·Structure ·Noise

·Fluent ·Dynamic Behavior HEADER

LINK DRUM CASING DUCT INSULATION

P & ID

Computerized Drawings

Drum. exe Header. exe

Stack. exe Duct. exe

Insul. exe

Formod. exe Hrsgsim. exe

Natbm. exe Circ. exe

2D AUTO DWG & BOM

for Pressure Parts

Performance

Components

PPA 3D Modeling

DESIGN

PRODUCTION LEAD TIME

Harp Ass’y Module Ass’y

GA 3D Modeling

(4)

DH0511/H Doosan Hydro Technology, Inc.

9001 Brittany Way Tampa, Florida 33619, USA Tel. 1-813-549-0182, Fax. 1-813-549-0183 Doosan Heavy Industries & Construction Co., Ltd.

www.doosanheavy.com Seoul office

1303-22, Seocho-Dong, Seocho-Gu. Seoul 137-920, Korea (C.P.O Box 1826, Seoul Korea)

Tel. 82-2-2-513-6114, Fax. 82-2-513-6200 Head office and Changwon plant

555, Guigok-dong, Changwon, Gyeongsangnam-do, 641-792, Korea Tel. 82-55-278-6114, 7114 Fax. 82-55-264-5551,5552

GLOBAL NETWORK

Doosan Heavy Industries America Corp.

400 Kelby Street, Parker Plaza, 10th fl.

Fort Lee, NJ 07024, USA Phone : 1 201 944 4554 Fax : 1 201 944 5022/ 5053

Doosan Heavy Industries Japan Corp.

Room2410,Mita Kokusai BLD.1-4-28, Mita Minato-ku, Tokyo, Japan 108-0073 Phone : 81 3 3452 5451~3

Fax : 81 3 3452 5624 Windsor Office

Westinghouse Electric, 20 International Drive, Windsor, CT 06095, USA (Windsor, Schenectady)

Phone : 1 860 731 6479 Fax : 1 860 731 6478 Schenectady Office

Room 33-202A, General Electric Bldg, One River Road, Schenectady, NY 12345, USA (Windsor, Schenectady)

Phone : 1 518 385 5218 Fax : 1 518 385 4984 Beijing Office

19F, Tower B Gateway Plaza, No. 18 Xiaguangli,

North Road, East Third Ring, Chaoyang District, Beijing 100027 Phone : 86 10 8454 7131~33

Fax : 86 10 8484 7139 Shanghai Office

Room 2802. City Center of Shanghai Bldg.,100 Zunyi Rd, Changning District Shanghai 200051, China

Phone : 86 21 6237 2485/2486 Fax : 86 21 6237 2487 Taipei Office

Room 704, No.51, Keelung Road Section 2, Taipei 110, Taiwan

Phone : 886 2 2739 2255(ARS) Fax : 886 2 2739 2266 Hanoi Office

#1101, Daeha Business Center, 360 Kim Ma, Ba Dinh District, Hanoi, Vietnam Phone : 84 4 273 0545~8 Fax : 84 4 273 0550 Bangkok Office

10th Floor, M-thai Tower, Wireless Road, Bangkok, Thailand

Phone : 66 2 654 0690~2 Fax : 66 2 654 0693 New Delhi Office

2A, 2nd Floor, Lotus Towers, Community Centre, New Friends Colony, New Delhi-110 065, India

Phone : 91 11 4132 8031 Fax : 91 11 4132 8039 Mumbai Office

1109&1110, 11th Floor, Maker Chambers-V, Nariman Point, Mumbai 400021, India Phone : 91 22 2202 6504 Fax : 91 22 2202 6557 Dubai Office

Office No. 308, Al Serkal Building, Airport Road PO Box 11859, Dubai, UAE (Dubai, Abu Dhabi)

Phone : 971 4 294 4699 Fax : 971 4 294 9930

Abu Dhabi Office

Al Ghaith Tower 5th Floor, Room 508, Hamdan Street, P.O. Box 27767, Abu Dhabi, UAE (Dubai, Abu Dhabi)

Phone : 971 2 627 6273 Fax : 971 2 627 6274 Riyadh Office

P.O.Box 9656, Riyadh 11423, Saudi Arabia Phone : 966 1 419 1920/1696 Fax : 966 1 419 1995 Kuwait Office

Villa 15, Street 24, Block 4, Sabah Al-Salem Area, Kuwait Phone : 965 551 8452/8436 Fax : 965 551 8453

Frankfurt Office

Frankfurt Office 9th Floor, Arabella Center, Lyoner Strasse 44-48, 60528 Frankfurt am Main, Germany

Phone : 49 69 69 5004 0 Fax : 49 69 69 5004 10 Tripoli Office

Phone : 971 50 459 2759 / 218 91 380 8021

MAJOR SUBSIDIARIES

Doosan Babcock Energy Limited 11 The Boulevard, Crawley West Sussex, United Kingdom RH10 1UX

Phone : 44 1293 584 990 Fax :44 1293 584 918 Doosan Heavy Industries Vietnam Co., Ltd.

[Doosan Vina]

No.1 An Duong Vuong Street, Quangngai City, Quangngai Province, Vietnam Phone : 84 55 713 001~7 Fax : 84 55 713 008

Doosan IMGB

104 Berceni Road, Bucharest 4, Romania Phone : 40 21 301 2602 Fax : 40 21 301 2502 Doosan Engineering & Services India Pvt. Ltd.

3rd Floor DLF Building No. 8, DLF Cyber City Phase -•±, Gurgaon Haryana (122-002), India Phone : 91 124 439 8200

Fax : 91 124 414 7006

Doosan Hydro Technology, Inc.

9001 Brittany Way Tampa, Florida 33619 Phone : 1 813 549 0182 Fax : 1 813 471 0713 Doosan HF Controls Corp.

16650 Westgrove Drive, Suite 500 Addison, Texas 75001, USA

Phone :1 972 367 4657 Fax : 1 972 367 4699

Ceylon Heavy Industries & Construction Co., Ltd. [CHICO]

Oruwala Athurugiriya Sri Lanka Phone : 94 114 440031 2 Fax : 94 114 440030 Hanjung Power Ltd.

P.O.Box 2803, Boroko, NCD Papua New Guinea Phone : 675 320 0529 Fax : 675 321 2984

Han-Viet Heavy Industry & Construction Corp. [HANVICO]

933 Ton Duc Thang Street, Hong Bang District, HaiPhong, Vietnam Phone : 84 31 371 2710 Fax : 84 31 712 714/715

(5)

INTRODUCTION

▲SEOINCHON C.C.P.P. #1, 2, 3, 4

Established in 1962, Doosan Heavy Industries & Construction

Co., Ltd. (DOOSAN) has played major roles in the development of Korea's power plant business with the cutting edge technology and high-caliber production facilities.

DOOSAN has extensive experience in supplying equipment for various types of power plants. DOOSAN has its own HRSG shop with a prodution capacity over 39 units per year. In particular, it has supplied over 150 units of HRSG for combined cycle power plants around the globe.

DOOSAN has continually been engaged in research and development on the Heat Recovery Steam Generator ("HRSG"). The R&D center has been

developing once-through technology, which will be applied to higher efficiency combined cycle power plant.

Meanwhile, DOOSAN has received 12 certificates of authorization from the ASME, allowing the company to use the ASME Code stamp for components, In addition, the company was awarded ISO 9000 series and ISO 14000 certifications for all its power plants components including the HRSG.

▲ESSAR C.C.P.P 515MW

(6)

Vertical gas flow with forced circulation in top supported type as well as horizontal gas flow, natural circulation bottom/ top supported type is composed of shop maximum assembled modules, properly braced for shipment and lifting in the field.

Large drums ensure proper steam purity and reduce water surge during start-up.

Heat transfer is achieved through extended surface spiral fins welded to the tubes. Generating tubes are rolled in module headers.

Standard headers for the economizers and superheaters provide uniform parts and shorter lead time.

The tubing is strength welded to these headers for increased reliability.

Multiple steam pressure available; single, double and triple pressure range.

(high, intermediate, low pressure)

FEATURE

MAJOR COMPONENTS

Optional Equipment

Vertical Type

- Duct Burner For Supplemental Firing - Selective Catalystic Reduction System (SCR)

- CO Catalyst - Exhaust Silencer

- Bypass Dampers and Stack - Expansion Joints, Piping, Deaerators, etc.

- Control System

Horizontal Type

1 2

3 4 5

6

8 9

16 14 15 13 12 11

10

7

1

4 6

18 17

19 20

21

7

8 9

11 12

10 13 14 5

2

16

3 15

❶ ByPass Stack

❷ Exhaust Stack

❸ Sliencer for HP Steam Line

❹ Sliencer for LP Steam Line

❺ Sliencer for Blow Down Tank

❻ Sliencer for LP Drum

❼ Slincer for HP Drum

❽ LP Drum

❾ HP Drum

❿ Seal Air Fan Unit Inlet Duct Blow Down Tank LP Circulation Pump (B) LP Circulation Pump (A) HP Circulation Pump (B) HP Circulation Pump (A)

❶ Stack

❷ HP Drum

❸ IP S/H & Drum

❹ LP Drum

❺ Deaerator

❻ Reheat Sky Vent Silencer

❼ HP STM Start-Up Silencer

❽ Reheat Inlet S/V Silencer

❾ HP Drum 2 Silencer

❿ LP STM Silencer LP Drum 1 Silencer IP Drum 1 Silencer IP STM Silencer IP Drum 2 Silencer LP Drum 2 Silencer Duct IP Drum 1 Silencer IP Sky Vent Silencer Reheat Outlet S/V Silencer HP Drum 1 Silencer (21) F/W Heater ReCIR. Pump

HP System IP System LP System S/V Exhaust Line PPA

(7)
(8)
(9)

HRSG Experience 1) DOMESTIC

CLIENT PROJECT GT TYPE WORK PERIOD

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

HANWHA ENERGY CO., LTD.

(KOREA)

HANWHA ENERGY CO., LTD.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

HANWHA ENERGY CO., LTD.

(KOREA)

HANWHA ENERGY CO., LTD.

(KOREA) POSCO (KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

LG / SIEMENS (KOREA)

KOREA ELECTRIC POWER CORP.

(KOREA)

KUNSAN CC POWER PLANT YUNGWOL CC POWER

PLANT SEOINCHON

CC #1,2 POWER PLANT

PYONGTAEK POWER PLANT ILSAN CC POWER

PLANT PUCHON CC POWER

PLANT SEOINCHON

CC #3,4 POWER PLANT BUNDANG CC #2

POWER PLANT HANLIM CC POWER PLANT

HEC NO.1 REPOWERING

HEC NO.2 REPOWERING

ILSAN CC POWER PLANT

(EXTENSION) ULSAN CC POWER

PLANT

PORYONG CC POWER PLANT

ULSAN NO.1 REPOWERING

HEC NO.3 CC POWER PLANT

HEC NO.4 CC POWER PLANT POSCO POHANG CC

POWER PLANT

PUSAN CC POWER PLANT

LG-IPP CC POWER PLANT

INCHEON

GE MS7B

GE MS7B

GE PG7E

GE MS7EA

WH 501D5

WH 501D5

GE PG7FA

ABB GT11N2

GE MS6B

WH 501D5

WH 501D5

WH 501D5

WH 501F

ABB GT24

WH 501D5

WH 501D5

WH 501D5

ABB GT11N2

GE 7FA

SIEMENS V84.3

SIEMENS V84.3

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE BOP PACKAGE

HRSG PACKAGE BOP PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE BOP PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE HRSG, BOP

PACKAGE STEAM TURBINE

PACKAGE

HRSG PACKAGE

HRSG PACKAGE

76. 11 - 78. 07

76. 11 - 78. 07

90. 05 - 92. 12

92. 07 - 95. 06

93. 05 - 95. 04

93. 05 - 95. 04

94. 10 - 97. 06

94. 10 - 96. 03

95. 11 - 97. 06

95. 12 - 97. 06

95. 12 - 97. 12

96. 01 - 97. 05

96. 01 - 97. 06

96. 04 - 00. 06

96. 11 - 98. 06

97. 11 - 99. 01

97. 11 - 99. 01

97. 10 - 01. 02

00. 09 - 02. 03

98 . 11 - 01. 06

03.05 – 04.08 94 X 4 UNIT

94 X 4 UNIT

425.7 X 8 UNITS (171.7, 200, 35.8,

18.2) 159 X 4 UNITS

(128, 24, 7)

224.1 X 4 UNITS (169.3, 54.8) 224.1 X 3 UNITS

(169.3, 54.8) 438.1 X 8 UNITS (174.4, 202.4, 36.8,

26.4) 164.5 X 3 UNITS

(127.8, 36.7) 69.9 X 2 UNITS

(61.9, 8) 312.5 X 3 UNITS (116.3, 140, 25.9,

30.3) 312.5 X 3 UNITS (116.3, 140, 25.9,

30.3) 224.1 X 2 UNITS

(169.3, 54.8) 472.2 X 4 UNITS (216.3, 200, 27.9,

28.0)

436.5 X 8 UNITS (187.5,203.6,23.6,21.8)

204.2 X 2 UNITS (166.7, 37.5) 323.4 X 3 UNITS (123.9, 146.8, 27.4,

25.3) 323.4 X 3 UNITS (123.9, 146.8, 27.4,

25.3) 200.3 X 2 UNITS

(160.6, 39.7)

458.9 X 8 UNITS (182,212.8,38.1,26.0)

455.2 X 2UNITS (178.9, 212.0,40.3,

24.8)

463.8 X 2UNIT (182.6,216.4,42.8,22)

63.5

63.5 100 23 25.5

4 92 23 9 92

8 92

8 125

25 27.5

3 65

4 61 10.8 90.2 30.6 32.0 3.5 90.2 30.6 32.0 3.5

92 8 129 35.1 36.5 4.5 106 25.7 28.5 3.5 60.2

8.0 108.0

31 32.4

5.8 108.0

31 32.4

5.8 73.9

4.6 131.5

26.6 29.0 4.2 133.0 29.4 31.5 3.8 135 27 29 4

427

427 542.3 542.3 287.6 252.9 498 256 207 505 SAT 505 SAT.

558 558 325 274 499 153 507 226 484 484 347 138 484 484 347 138 505 SAT 540 540 347 262 568 568 313 SAT 433 SAT 505 505 317 233 505 505 317 233 506 275 567.7 567.7 324.3 274.2 545.0 545.0 332.0 235.4 568 565 334 239

WORKING P.@

SHO (kg/㎠ ㎠g) CAPACITY

TON/HR x UNITS

WORKING T.@

SHO(℃ ℃ )

(10)

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

DUBAI ELECTRIC CORP. (U.A.E)

ESSAR POWER CORP.

(INDIA)

KPCL (INDIA)

MYANMAR ELECTRIC POWER ENTERPRISE (MYANMAR)

FIRST ENERGY / SIEMENS (PHILLIPPINES)

ENRON / SIEMENS (BRAGIL)

CMS / SIEMENS (UAE)

SCOTTISH HYDRO- ELECTRIC / SIEMENS (SCOTLAND) H.P. / PARSONS POWERGROUP INC.

(CROATIA) ISAGEN / PARSON (COLOMBIA)

GREAT YAMOUTH LTD., / GE (ENGLAND)

AES /

WESTINGHOUSE (USA)

EMPRESAS PUBLICAS DE MEDELLIN E.S.P / GE (COLUMBIA) HSIN TAO POWER CORPORATION / GE (TAIWAN)

LAEM CHABANG POWER / FORTUM (TAILAND) ELECTRICITY OF VIETNAM (EVN)

I.P.D.C. / MAPNA (IRAN)

JABEL ALI POWER PLANT

ESSAR 500MW POWER PLANT

KPCL CC POWER PLANT

MYANMA CC POWER PLANT

SANTA RITA 1000MW CCPP

CUIABA CC POWER PLANT

AL-TAWEELHA A2

PETERHEAD CC POWER PLANT

TETO ZAGREB CC POWER PLANT

TERMOCENTRO

GREAT YARMOUTH

IRONWOOD CC POWER PLANT

EPM LA SIERRA CC POWER PLANT

EVERGREEN - HSIN TAO POWER PLANT

LAEM CHABANG POWER PLANT

BARIA Ⅱ POWER PLANT

FARS

AEG PG9E

GE PG9E

ALSTHOM 9E

GE 6B

SIEMENS V84.3A

SIEMENS 84.3

SIEMENS V94.3

SIEMENS V94.3A

GE 6FA

WH 501D

GE 9FA

WH 501G

GE 7FA

GE 7FA

GE 6B

GE 6B

GE 9E

TURNKEY CONTRACT (supplementary firing) HRSG, BOP PACKAGE STEAM TURBINE

PACKAGE

HRSG PACKAGE

HRSG MODULES

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE, GAS TURBINE

HRSG PACKAGE

HRSG PACKAGE BOP PACKAGE

86. 02 - 88. 10

94. 04 - 95. 11

97. 10 - 00. 12

95. 06 - 96. 03

97. 12 - 2000. 09

98. 02 - 2000. 05

98. 11 – 2001. 06

98. 06 - 00. 02

98. 12 - 00. 10

99. 01 - 00. 01

99. 01 - 01. 01

99. 02 – 99. 12

99. 03 – 00. 11

99. 06 –00.04

99. 10 – 01. 06

99. 11 – 00.11

00.01 – 01.01 250 X 3 UNITS

(250)

210.4 X 3 UNITS (176.2, 34.2)

227.4 X 2 UNITS (185.9,26.2,15.3)

48 X 6 UNITS (48.0)

479.4 X 4 UNITS (198.2, 222.9, 39.9,

18.4)

433.3 X 2 UNITS (179.7, 201.5, 29.0,

23.1) 600 X 3 UNITS

(600) 664.5 X 3 UNITS (287.0, 311.5, 36.0,

30.0)

122.4 X 2 UNITS (108.9, 13.5)

177.8 X 2 UNITS (145.2, 32.6)

684 X 1 UNIT (287.0, 317.6, 39.0,

40.4)

615.3 X 2 UNITS (238, 285.8, 57.3,

34.2)

461.3 X 2 UNIT (184.0, 211.6, 33.4,

32.3) 387.2 X 3UNITS (165. 180.8, 22.4,

19.0)

75.1 X 2UNITS (64.2, 10.9)

74.5 X 3UNITS (62.3, 12.2) 179.9 X 6UNITS

(144.7, 35.2)

11

79.5 5.3

90.2 19.4 3.9

52.0

111.3 29 31.5

3.9 110.7

29.0 31.5 3.9

74

137.0 39 40 5.3 96.1 10.8

92.3 11.9 100.7

21.7 23.7 3.1 125 34.0 36.4 3.4 128.2

23.7 28.1 4.3 121.1

21.0 22.6 4.8

73.9 12.6

73.4 6.4

89.7 6.4

SAT

525 210.4

513 291 181.8

510

540 540 325 235 550 550 320 234.7

522

540 540 325 240 540 285

513 295 567 567 312 256 568 568 272 268 567 566 322 317 567.7 567.7 312.0 309.0 511.4 286

512 213

512 229

CAPACITY TON/HR x UNITS

WORKING P.@

SHO (kg/㎠ ㎠g)

WORKING T.@

SHO(℃ ℃ )

(11)

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

LA COMPANIA DE ELECTRICIDAD / SIEMENS CEYLON ELECTRICITY BOARD (CEB) / TPK

SARGENT & LUNDY AND ZACHARY

TAMPA ELECTRIC COMPANY (USA)

TAMPA ELECTRIC COMPANY (USA)

BECHTEL (MEXICO)

GE (MALAYSIA)

GE (SPAIN)

SARGENT & LUNDY (USA)

SIEMENS (MALAYSIA)

GE (MEXICO)

UAE OFFSET GROUP (UAE)

PARSONS (USA)

GE (BRAZIL)

SANPEDRO

KELANITISSA CCPP

CORPUS CHRISTI

TECO BAYSIDE POWER PLANT

TECO BAYSIDE POWER PLANT (Extension)

LAROSITA

SKS

CASTEJON

SANDHILL

PANGLIMA

ALTAMIRA

FUJAIRAH

CHEHALIS

THERMOPERNANBUCO

SIEMENS 64.3A

GE 9E

GE 7FA

GE 7FA

GE 7FA

WH 501FD

GE 9FA

GE 9FA

GE 7FA

V94.3A

GE 7FA

GE 9E

GE 7FA

GE 7FA

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

00.02 - 01.09

00.06 – 01.03

00.06 – 01.07

00.06 – 04.05

00.10-04.05

00.11 – 01.07

00.12 – 01.12

01.01 – 01.12

01.03 – 02.06

01.03 – 02.12

01.03 – 02.06

01.06– 03.06

01.07 – 02.04

01.07 – 02.11 130.3 X 3UNITS

(117.0, 13.3) 221.7 X 1UNIT

(185.8, 35.9) 461.3 X 2UNITS (184, 211.6, 33.4,

32.3)

477.7 X 3UNITS (207, 226, 23.8, 18.9)

477.7 X 3UNITS (207, 226, 23.8, 18.9)

477.7 X 3UNITS (207, 226, 23.8, 18.9)

479.8 X 3UNITS (185,224,37,33.8)

656 X 1UNITS (282, 303, 33, 38)

648 X 1UNIT (278,297,36,37)

425.6 X 1UNIT (188.3,184.2,33.9,

19.2)

658.9 X 2UNITS (267,307.2, 48.7,36)

514 X 4UNIT (222, 243, 22, 27)

313.6 X 4UNITS (313.6) 466.1 X 2UNITS (188.2,220.8, 34.3,

22.8)

551 X 2UNIT (246,267, 17, 21)

82.2 4.0 74.3

6.3 128.2

23.7 28.1 4.3 107 37.7 39.6 9 107 37.7 39.6 9 107 37.7 39.6 9 131 29.4 31 4.5 99 23 24 4.1 95 23 24 4.1 72.1 11.8 13.8 1.1 135.9

31.5 32.8 5.2 114 27.5 29.5 4.9

65

112.5 23.8 25.7 4.6 132.2

31 36 4.9

542 200 511.4 214.8 567 566 322 317 543.3 543.3 312.8 235.5 543.3 543.3 312.8 235.5 543.3 543.3 312.8 235.5 568 568 319 317 567 567 298 295 567 567 298 295 568 568 287 240 568 565 335 240 567 567 309 307 532.4

566 565 318 316 567 567 322 320

CAPACITY TON/HR x UNITS

WORKING P.@

SHO (kg/㎠ ㎠g)

WORKING T.@

SHO(℃ ℃ )

(12)

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

HYUNDAI (BRAZIL)

SIEMENS (VIETNAM)

ENEL POWER (QATAR)

TOSHIBA (TAIWAN)

SIEMENS (ISRAEL)

SIEMENS (SPAIN)

GE (SPAIN)

SIEMENS (ISRAEL)

SIEMENS (SPAIN)

SIEMENS (SPAIN)

GE (SPAIN)

GE (SPAIN)

CEGCO (JORDAN)

THERMONORTE

Phu My III CCPP

RAS LAFFAN

CHIAHUI

GEZER / HAIFA

GIBRALTAR

AMOREVIETA

HAIFA 3

PALOS

PALOS (Extension)

SABON

ACECA

REHAB

GE 7EA

V94.3A

GE 9E

GE 7FA

V94.3A

V94.3A

GE 9FA

V94.3A

V94.3A

V94.3A

GE9FA

GE9FA

GE9E

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE (supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

01.08 – 02.06

01.10 – 02.09

01.10 – 03.02

01.11 – 02.10

02.01 –

02.03 –

02.05 –

02. 11–

02. 02–

03. 01– 04.12

03. 01– 04.02

03. 01– 04.02

03.06-04.06 122.8 X 3UNITS

(122.8)

660 X 2UNITS (279,311,26,44)

384.1 X 4UNITS (384.1)

442 X 3UNITS (184,212,32,14)

666 X 3UNITS (265,311,51,39)

634 X 2UNITS (288,264,46,36)

664.4 X 2UNITS (266.6,314.9,49.7,33.2)

665 X 1UNITS (265,311,51,38)

683.8 X 2UNITS (278.3,320.9,48.2,36.4)

683.8 X 1UNITS (278.3,320.9,48.2,

36.4)

675.5 X 1UNIT (282.7,312,39.6,41.2)

675.5 X 1UNITS (282.7,312,39.6,41.2)

190.6 X 2UNITS (160, 30.6)

91.5

116.1 29.6 30.9 4.7

96.3

132.5 31.6 34.2 6.1

131.4 30.1 31.4 3.65

126.2 25.3 26.6 6.6

124 24.8 27.3 5.3

131.4 30.1 31.4 3.65

121 30.6 32.7 3.8

121 30.6 32.7 3.8

99.2 23.0 25.0 5.1

99.2 23.0 25.0 5.1

104 15.5

502

551.2 550.3 322.8 237.3

567.0

538.3 537.5 325.0 295.7

567.4 550.2 331.5 236.8

540 550 325 235

566.9 566.3 314.1 309.6

567.4 550.2 331.5 236.8

538.3 550.0 328.2 239.7

538.3 550.0 328.2 239.7

566.7 566.1 300.6 297.8

566.7 566.1 300.6 297.8

518 260

CAPACITY TON/HR x UNITS

WORKING P.@

SHO (kg/㎠ ㎠g)

WORKING T.@

SHO(℃ ℃ )

(13)

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

SIEMENS (SAUDI)

TOSHIBA (UAE)

TOSHIBA (UAE)

MAPNA (IRAN)

MARUBENI (VIETNAM)

DAEWOO E&C (LIBYA)

SGCC (OMAN)

HYUNDAI E&C (LIBYA)

AL JUBAIL

JEBEL ALI

UMM AL NAR

MAPNA

PHYMY 2.1 EXT. ADD-ON

BENGHAZI

SOHAR

ZAIWA

WH501DA

GE9FA

GE9FA

WH701D

GE9E

V94.2

V94.2

GT13E

V94.2

GT13E

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

03.06-05.01

03.07-04.05

03.07-06.06

03.07-04.05

03.07-04.10

03.07-07.10

03.12 – 05.01

04.03 – 05.02

04.09 – 05.10

04.10 – 05.10 255 X 2UNITS

(255)

720 X 3UNITS (720)

580 X 5UNITS (580)

273.6 X 2UNITS (241.2, 32.4)

273.6 X 2UNITS (241.2, 32.4)

273.6 X 40UNITS (241.2, 32.4)

274.2 X 2UNITS (211.2,34.3,28.7)

269 X 4UNITS (220,49)

453 X 3UNITS (395,58)

267 X 4UNITS (218,49)

51

95

89.4

90.6 8.4

90.6 8.4

90.6 8.4

101.9 24.3

3.8

83.6 5.1

88.7 3.6

92.6 9.6

402

562

569

520 233

520 233

520 233

532 533 150

512 262

543 246

513 276

CAPACITY TON/HR x UNITS

WORKING P.@

SHO (kg/㎠ ㎠g)

WORKING T.@

SHO(℃ ℃ )

참조

관련 문서

Specifically, topics such as urban environmental factors that aggravate the heat wave phenomenon (e.g., the heat island effect) [4,5], commu- nity characteristics that

ment were observed in milk yield, although the average milk yield was numerically higher in glycerin­fed groups. This might be because CG has a mildly sweet taste,

This induction motor will follow the characteristic of wind turbine since the torque reference is obtained from mathematical model of wind turbine.. By using this wind

As described that steam temperature system is constructed with many diverse blocks and each block has a simple first order model, the total system model which is linear

The proposed system comprises a cycloidal wind turbine adopting a cycloidal rotor blade system that is used at a high altitude.. The turbine is mounted on a

• Harmless WebView: The input APK containing a WebView component is named as a Harmless WebView if and only if any of the inference rules produces negative results. That is,

This research extends the available literature on trust and psychological contract by proving that the psychological contract fulfillment facilitates the trust between consumers

환경기술 적용 방법에 따른 이산화 탄소 감소량 예측...