Glenn Ochate Amador
PERSONAL DATA
Age: 32
Date of Birth: Sep 3, 1976
Gender: Male
Civil Status: Married
Height: 167 cm
Weight: 82 kg
Nationality: Filipino
Religion: Christianity - Others
EDUCATION
Highest Education
Education Level: Bachelor's / College Degree Education Field: Engineering(Mechanical) Course: B.S. Mechanical Engineering School/University: University Of San Jose-Recoloetos Location: Cebu City
Date: Jun 1993 - Mar 1998
LICENSES/CERTIFICATIONS
License/Certification Exam Taken License/Certification No. Date
1. Mechanical Engineer 0054264 Dec 8, 1998
WORK EXPERIENCED
I have been working for 9.0 year(s).
Position: Field Piping Engineer
Duration: Nov 10, 2007 - PRESENT(1 yrs) Company: Tecnimont SpA, Milan Italy Company Industry: Oil / Gas / Petroleum
Location Aromatics Complex Project, Kuwait Department: Piping/Mechanical
1.
Job Description: Nov. 2007 to Present Tecnimont Spa, Milan Italy
Project Name:Kuwait Paraxylene Production Plants (K.P.P.C.)/Petrochemical Industries Company (PIC) Aromatics Complex Project, State of Kuwait
Position: Field Piping Engineer
Duty:
•Review the submitted test package of contractor and conduct site inspection of pipe line which is mentioned and included in the test pack prior to release for final testing.
•Conduct punch listing of pipe lines base on test pack of the contractor and give comments if any deficiency found to be rectified.
•Review the site detail isometric drawing of contractor if it is according to the latest issued revision of Isometric drawing from Tecnimont.
•Verified field dimensions on the piping isometric drawing prior to start pipe fabrication to ensure the exact length of pipe’s spool fabrication.
•Monitor the site fabrication, construction, and installation of pipe spool of the contractor.
•Review of P&ID and compare it with Isometric drawing to check its completeness of all piping accessories or auxiliary components.
•Witness of the hydro testing of the pipeline.
Position: Mechanical Field Piping Engineer Duration: May 17, 2006 - Jul 8, 2007(1.1 yrs) Company: Safari Company Limited, KSA Company Industry: Oil / Gas / Petroleum
Location Jubal, Saudi Arabia Department: Engineering 2.
Job Description: Reviews specification, inspection reports, delivery manuals and technical data to assist Equipment selection, bid evaluation and selection of suppliers.
Reviewed relevant documents MTC, Data sheet and laboratory test report of all supplied materials and equipments to ensure that they meet the required specifications as per project requirements, contracted terms and condition, and issue of material requisitions.
Coordinate with the Design Engineer regarding piping design, material specification, stress analysis, and design calculation prior to start the fabrication of pipings and its components.
Ability to perform pipe wall thickness calculations and document the results.
Ability to write piping requisitions for bulk purchase items and valves
Planning, reporting and change control and able to plan and control mechanical group activities through to successful project completion and prepares reports of piping construction progress.
Evaluate and review material specifications and materials take-off for material requisition.
Supervised the installations of RTR pipes for Utility pipings such as Fire water, Sea water and potable water lines.
A preparation of materials quantity takes off of the project as per B.O.Q. and approved drawings.
Position: Mechanical Engineer
Duration: Mar 14, 2005 - Apr 20, 2006(1.1 yrs) Company: Gemrose Technical Services
Company Industry: General Trading
Location Lapu-Lapu City, Cebu Philippines Department: Engineering
3.
Job Description: Assign as Mechanical Engineer for Ship Repair Project in Keppel Cebu Shipyard Inc., to provide report on the daily activities and coordinate with Client supervisor.
Assign to monitor the daily activities and supervised the execution of piping spool fabrication works.
Supervised the removal of all corroded pipes in the vessel and arrange for the replacement with newly fabricated pipes spool.
Evaluate and review material specifications and initiate materials take- off for bulk requisition.
Conduct daily tool box meeting to the skilled personnel to aware the nature of job and its safety measures as a part of safety compliance with Shipyard safety policy.
Position: Mechanical Engineer
Duration: Oct 10, 2002 - Mar 12, 2005(2.4 yrs) Company: Arabian Fal Company, KSA
Company Industry: Oil / Gas / Petroleum Location Rahima, Rastanurah, KSA Department: Engineering
4.
Job Description: 1) Assigned as Project Engineer for the construction of natural gas filtering system of Saudi Methanol Company, SABIC, Jubail, KSA.
ASSIGNMENT:
Coordinate with the Design Engineer regarding piping design, material specification, stress analysis, and design calculation prior to start the fabrication of pipings and its components.
Attended Project Management Team weekly meeting and provide them a report on site construction progress.
Provide materials quantity takes off based on the approved
construction drawing to ensure that all materials are available at job site.
Supervised the fabrication of 24” diameter, ASTM A53 grade B schedule 80, pipe spools and its component, and ensure that they are fabricated in conformance with ASME B31.3 known as the Process Piping Code.
Ensure that the preparation of weld joint is in accordance with the ASME B31.3 standard and the alignment of joining pipes shall be maintained properly prior to apply full welding.
Ensure that all welding operators are qualified welders and maintained WPS and WPQ records at site for reference and reviewed by
Authorized Inspectors.
2) Mechanical Engineer Supply to Saudi Aramco Riyadh Refinery During Sept 2003 Major Shutdown.
ASSIGNMENT:
Evaluate and review-engineering packages as per engineering
standards, engineering drawings, and material specifications based on Aramco requirements.
Conduct field survey and prepare estimates for labor and material costs.
Evaluate material take-off and follow up direct charge materials
Follow-up construction work and coordinate its activities.
Assistance to the Technical Support Group during refinery major shutdown.
Conduct material inspection at refinery if there is conflict between drawing and materials take off list.
Arranging of as- built drawing and distribute to selected contractors during refinery shutdown
3) Mechanical Engineer Tank Farm Maintenance Saudi Aramco, Riyadh Refinery.
ASSIGNMENT:
Prepare as built drawing of the mothballed tanks RYT 50, 51 and 52 for Riyadh DHT project of Saudi-Aramco. The three diesel tanks are for revamping.
Prepare work procedure of revamping tank RYT 50, 51 and 52 as per API 650 & 653 standard then submit to Saudi-Aramco for approval.
The work procedures are included installation of new bottom plate above existing bottom plate, alteration of shell nozzle conforming to API standards, installation of magnesium anode between new plate and existing plate, and painting and blasting procedures as per Aramco Standards
Position: Mechanical Maintenance Supervisor Duration: Jul 14, 2000 - Jul 14, 2002(2 yrs)
Company: Ministry Of Defense And Aviation , Royal Saudi Air Defense Force Company Industry: Government
Location Um Al-Sahik, Safwa, Dammam, KSA Department: Engineering Maintenance
5.
Job Description: Conduct daily check up of all operational equipments and records their abnormality if found.
Initiate the shutdown of the equipment if found abnormal functioning during operation.
Records all the running hours of the equipment to ensure its proper maintenance schedule.
Submit weekly report to Site Manager regarding equipment status.
Planning for Preventive Maintenance Schedule of electro mechanical equipments to ensure that they are maintained properly.
Position: Laod Dispatching Engineer
Duration: Nov 20, 1998 - Mar 20, 1999(0.3 yrs) Company: East-Asia Utilities Corporation, Cebu, Phils.
Company Industry: Utilities
Location Bo. Ibo, MEPZ 1, Lapu-Lapu City, Cebu, Philippines Department: Laod Dispatch Section
6.
Job Description: •Planning and scheduling of the daily power output of the plant.
•Supervised the Plant Operator to follow the scheduled daily power output of the plant.
•Monitor the actual power demand of the consumers and compare it against the scheduled power demand.
•Ensure that there would be no unscheduled power shutdown to avoid power lagging on Luzon-Visayas Power Grid.
•Coordinate with Visayan Electric Company and National Power Corporation Engineers regarding Power Plant’s total energy output of the day.
•Ensure that there would be enough energy to supply to Mactan Economic Zone Authority the primary costumer of East-Asia Utilities Corporation