• 검색 결과가 없습니다.

Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System

N/A
N/A
Protected

Academic year: 2021

Share "Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System"

Copied!
1
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

풍력 <<

35

전산유체역학을 이용한 풍황탑 차폐효과 해석

*김 태성, **이 희남, 김 현구

Analysis of the Effect of Met Tower Shadow using Computational Fluid Dynamics

*Taesung Kim, **Huinam Rhee, Hyun-Goo Kim

When the wind speed is measured by the met-mast sensor it is distorted due to the shadow effect of tower. In this paper the tower shadow effect is analyzed by a computational fluid dynamics code. First three dimensional modeling and flow analysis of the met-mast system were performed. The results were compared with the available experimental wind-tunnel test data to confirm the validity of the meshes and turbulence model. Two-dimensional model was then developed based on the three-dimensional works and experimental data. 2D analysis for various Reynolds numbers and turbulence strengths were then performed to establish the tower shadow effect database, which can be utilized as correction factors for the measured wind energy.

Key words : Met Tower(풍황탑), CFD(전산유체역학), Wind Power Generation(풍력발전), Turbulence Intensity(난류

강도), Effect of Tower Shadow(차폐효과)

E-mail : *[email protected], **[email protected]

3MW 풍력발전시스템 개발품의 육상풍력실증단지 조성 타당성 평가를 위한 풍황 및 지형평가 연구

*우 상우, 이 기학, 이 상일, 박 종포

Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System

*Sangwoo Woo, Ki-Hak Lee, Sang-Il Lee, Jong-Po Park

A wind turbine power performance test is very important to wind turbine manufacturers because a wind farm developer or planner must want to define power performance characteristics and reliability of new wind turbines. Based on the IEC 61400-12-1, A wind turbine test site has to be nicely installed at flat terrain for testing. We are developing the wind power system which is IEC wind class IIa model with rated power of 3MW. KEPCO’s Gochang power testing center was considered as candidates to build the test site without site calibration. This paper aims to verify the validity of the test site by using implement site assessment result that was based on IEC 61400-12-1.

Key words : Wind turbine test site(풍력실증단지), IEC 61400-12-1, WinDS3000TM, Site assessment(지형평가), Site

calibration(지형보정)

참조

관련 문서

Basic knowledge of fluid mechanics for hydropower, wave power, and wind power.. Basic physical

Eole Water claims to have successfully modified the traditional wind turbine design to create the WMS1000, an appliance that can manufacture drinking water

풍력의 제어시스템은 풍속에 따른 출력, 피치각, 로터와 발전기의 회전수를 조절하는 속도 및 출력 제어 시스템, 풍향과 제동장치, 회전방식에 대한 제어 를 담당하는

fully developed sea: unlimited fetch and duration of wind; wind energy input is balanced by energy dissipation due to wave breaking.. growing sea: limited fetch and

Temperature, Temperature difference between 10m and 300m, Humidity, Wind speed, Wind speed difference between 10m and 300m, Wind direction, Vertical Wind average,

▶ One example where the Rayleigh distribution naturally arises is when wind speed is analyzed into its orthogonal 2-dimensional vector components. Assuming that the magnitude

“Evaluation of R&amp;D investments in wind power in Korea using real option.” Renewable and Sustainable Energy Reviews. &#34;Real Option Valuation of a Wind Power Project Based

KEY WORDS: Variable-pitch; 가변 피치, Vertical axis wind turbine; 수직축 풍력발전기, Model test; 모형시험, Floating wind turbine test; 부유식 풍력실험,