• 검색 결과가 없습니다.

Florentino Jr. Magboo Silang

N/A
N/A
Protected

Academic year: 2022

Share "Florentino Jr. Magboo Silang"

Copied!
3
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Florentino Jr. Magboo Silang

PERSONAL DATA

Age: 35

Date of Birth: Mar 21, 1973

Gender: Male

Civil Status: Married

Height: 169 cm

Weight: 70 kg

Nationality: Filipino

Religion: Christianity - Catholic

EDUCATION

Highest Education Second Highest Education

Education Level: Bachelor's / College Degree Vocational Diploma/Short Course Certificate Education Field: Engineering(Mechanical)

Course: BS Mechanical Engineering School/University: Technological Institute Of The

Philippines (TIP MANILA) Location: P. Casal St. Quiapo Manila Date: Oct 1992 - Oct 1995

LICENSES/CERTIFICATIONS

License/Certification Exam Taken License/Certification No. Date 1. Registered Mechanical Engineer 0050475 Nov 7, 1996

WORK EXPERIENCED

I have been working for 5.3 year(s).

Position: QA/QC PIPING/WELDING INSPECTOR Duration: Jul 27, 2006 - May 30, 2008(1.8 yrs) Company: CTSD LIMITED SAKHALINSK RUSSIA Company Industry: Oil / Gas / Petroleum

Location Russia

Department: QA/QC DEPARTMENT 1.

Job Description: Execute the field welding inspection, surveillance and Quality Control activities on site, collecting the relevant objective proofs, ensuring that all welding operations are executed in accordance with all relevant Codes of Practices and Company procedures/practices.

(2)

Position: QC ENGINEER

Duration: Jul 1, 2005 - Jul 18, 2006(1 yrs)

Company: EEI CORPORATION(Goro Nickle Project Calendonia Australia) Company Industry: Oil / Gas / Petroleum

Location CD Fabrication Shop Sta Maria Bauan Batangas Philippines Department: QA/QC Department

2.

Job Description: WELDING, PIPING, MECHANICAL, STRUCTURAL AND MATERIAL RECEIVING Inspector.

Carry out inspection and testing activities for welding piping, mechanical, structural and material receiving.

Prepare and implement the available standards, code, tolerances based on the approved drawing and specification of the client.

Coordinate with the material control section for the schedule of material delivery and inspection schedule.

Coordinate with Goro Construction team if there is any hold point for the materials or need client disposition.

Conduct visual inspection on weldments specification, dimension and appearance of both piping and structural materials.

Check and confirm the quality of weld and welders qualification performing welding works base on the approved WPS.

Inspect and monitor WVIR (Welding Visual Inspection Report) prior to client approval and acceptance.

Conduct final inspection and generates inspection reports prior to client acceptance if erection is completed as per module basis.

Conduct dimensional and visual inspection of fit-up spool piece based on the approved ISO drawing.

Conduct inspection line checking and punch listing for the given test package for piping prior to Hydro testing and Pneumatic testing.

Generates QC inspection (In-Process and Final inspection Reports ) and other document concerning the quality of works and products.

Coordinates for NDE personnel for the testing (RT ,PT,MT AND PMI)of the welded joint of both structural and piping.

Conduct Mechanical inspection by checking the foundation’s orientation, location and levelness of equipment (pumps and compressors, vessels etc).

Responsible for the attaining the quality objective by implementing the correct job responsibilities in related and conforming to safety program.

Controls welding parameters and consumables during

installation/construction activities, supervising welding operations.

Checks the availability and suitability of the filler material and of the preheating, welding, heat treatment, the bevels, and the extent of the repairs made by the various welders and taking any corrective actions, the heat treatment record diagrams.

Performs Pipes line up check, ensuring that all installed pipe/fittings are to the correct specification and that the material is in accordance with the specified Material Trace ability requirements.

Executes the specific inspections on materials, equipments and construction/installation activities on site.

Issues the relevant Quality Records and, when necessary, writes and sends to QC Supervisor non-conformances reports.

Controls equipment installation, alignment and leveling.

(3)

Performs functional checks and mechanical completion checks (Pressure and atmospheric vessel).

Checks of level ness, position, orientation, anchor bolts, conduits, etc.

of tanks foundation.

Performs punch-listing operations.

Position: QC ENGINEER

Duration: Jan 7, 2002 - Oct 25, 2002(0.8 yrs) Company: EEI Corporation

Company Industry: Oil / Gas / Petroleum

Location EEI CORPORATION CD Shop Sta Maria Bauan Batngas Philippines Department: QA/QC Department

3.

Job Description: Execute the field welding inspection, surveillance and Quality Control activities on site, collecting the relevant objective proofs, ensuring that all welding operations are executed in accordance with all relevant Codes of Practices and Company procedures/practices.

Position: QC ENGINEER

Duration: Mar 30, 2001 - Nov 27, 2001(0.7 yrs)

Company: EEI /Foster Wheeler Corporation(Fabrication Of Structural Material Of Malampaya On Shore Gas Plant)

Company Industry: Oil / Gas / Petroleum

Location EEI Corporation Cd Fabrication Shop Sta Maria Bauan Batangas Phil.

Department: QA/QC DEPARTMENT 4.

Job Description: Execute the field welding inspection Piping, Structural and Material receiving inspection, surveillance and Quality Control activities on site, collecting the relevant objective proofs, ensuring that all welding operations are executed in accordance with all relevant Codes of Practices and Company procedures/practices.

참조

관련 문서

With an external magnetic field, the photonic Janus balls align their magnetic moment to the field and adjust the degree to which their structural color is displayed.

The systems approach involves sequentially the following: - site selection, site description and characterisation (diagnosis), planning of on- farm research, on -

The programme used visual inspection of cervix after acetic acid application (VIA) as a screening tool, nurses in the primary care centres as the primary screeners and

The central Zn(II) atom has a tetrahedral coordination geometry, with the heterocyclic nitrogen atoms of 2-aminothiazole ligands and the nitrogen atoms of isothiocyanate

The testing methods are heuristic evaluation, perspective-based user interface testing, cognitive walkthrough, pluralistic walkthrough, and formal usability inspection.. It

requirements of all applicable EFPs, EOPs and checklists/reports as required by the EMS. The Contractor will conduct and document pre-work meetings and inspection reports as

Some agencies for environmental test inspection, they sometimes misunderstood that the QA/QC was ended with proficiency testing performance and on-site assessment by a

Abstract: In this paper, a visual welding inspection system for LNGC ship construction process is developed, which is mounted on a wall-climbing robot. For this purpose, we