Procedure for Obtaining an ASME “Code Stamp” or a National Board “R Stamp”

Sperko Engineering Services, Inc. Page 1 11/25/00

1. Determine which stamps will be needed over at least the next three years. ASME “Code” Stamps (PP, A, S, U, H, etc.) are required in most States to build NEW pressure vessels, boilers and to install some piping that comes directly off boilers. The National Board “R” stamp is required in some states to make repairs or alterations to EXISTING ASME “Code Stamped” pressure vessels, boilers and piping. The requirement to have an “R” stamp is becoming more commonplace each year. In addition, some owners and engineers require that contractors have

“R” or other stamps to be eligible to do work for them. Companies that have “stamps” are recognized widely as those that are more capable and quality-oriented than companies that do not have “stamps.”

2. ASME Code Stamps cost approximately $1600 each every three years, plus a shop or field survey (i.e. audit) every three years. An R Stamp costs approximately $550 every three years, plus a shop or field site audit every three years. The direct audit cost is about $5,000. If you get more than one stamp at the same time, only one audit is conducted. The Stamp fees and a retainer for the survey is payable in advance.

3. Obtain ASME “Code” stamp application forms from ASME Code Accreditation Department, Three Park Avenue, New York, New York 1001-5990 (212-591-8581) or at www.asme.org. Obtain “R” stamp application forms from the National Board of Boiler and Pressure Vessel Inspectors, 1055 Crupper Avenue, Columbus, Ohio (614-888- 8320) or at www.nationalboard.org. Complete and send in these forms along with the requested funds. Expect 8 to 12 weeks until the survey can occur.

4. If acquiring an “R” Stamp, obtain a copy of the National Board Inspection Code (NBIC) from National Board. If repairs are going to be made on ASME Code-Stamped tanks, boilers or piping, or if acquiring ASME “Code”

Stamps, obtain the applicable Code books from ASME Publications Department (1-800-THE ASME) or at www.asme.org. See the attached list of required Code Sections for each Code stamp.

5. Contact an Authorized Inspection Agency and arrange a contract for their services. YOU MUST HAVE A

CONTRACT IN FORCE BEFORE THE NATIONAL BOARD OR ASME WILL SCHEDULE THE SURVEY. A list of Inspection Agencies is posted on both the National Board and ASME web sites. One only pays for the services of the Inspection Agency as they are used, and their use is only required when manufacturing, erecting or repairing ASME Code-stamped items and during the survey

6. Prepare a Quality Control Program following the requirements of the National Board Inspection Code and/or ASME as applicable. Assistance in developing the QC Program and training in its implementation can be obtained from Sperko Engineering Services, Inc. (336-674-0600 or at sperko@asme.org.)

♦ Prepare and qualify welding procedures and welders. Prepare NDE procedures and qualify personnel in accordance with ASNT document SNT-TC-1A or make arrangements with an outside NDE laboratory.

♦ Subcontracted services are acceptable for most specialized activities (e.g.. design, drawings, NDE, heat treating) but not for welding. The Stamp holder is responsible for ALL work done, including any subcontractor work.

7. Have Authorized Inspection Agency review and concur with QC program. Prepare mock-up pipe/vessel or repair, as appropriate for the Stamp desired, following the QC program. Leave one major seam tacked but unwelded or as directed by the Authorized Inspector. Assistance with this is available from Sperko Engineering.

8. The Quality Control manual and its implementation will be audited by a Representative of the National Board of Boiler and Pressure Vessel Inspectors or Chief Inspector of the Local Jurisdiction and your Authorized Inspection Agency Supervisor and your Authorized Inspector.

♦ First day - Review of QC program, Implementing QC procedures, welding and NDE procedures.

♦ Second day - Shop inspection to verify implementation of program. Revisions to QC program.

When the audit is conducted by local jurisdiction, it may only take one day.

9.

Audit team will advise towards the end of the second day in the exit interview whether your program passed or failed. . You may begin work with the concurrence of the Authorized Inspector after a successful survey, but you may not actually stamp anything until you receive the stamp from ASME or National Board, usually within a couple of weeks.

(2)

Procedure for Obtaining an ASME “Code Stamp” or a National Board “R Stamp”

Sperko Engineering Services, Inc. Page 2 11/25/00

TABLE OF POSSIBLE STAMPS

CODE SECTION STAMP ITEM

I A Assembly of Power Boilers

S Power Boilers

M Miniature Boilers

E Electric Boilers

PP Power Piping

V Boiler Safety Valves

III N Nuclear Components

NA Nuclear Shop Assembly and Installation NPT Nuclear Parts

NV Nuclear Valves

IV H Heating Boilers

HLW Lined potable water heaters VIII, Division 1

U Pressure Vessels

UM Miniature Pressure Vessels UV Pressure Vessel Safety Valves VIII, Division 2

U2 Pressure Vessels VIII, Division 3

U3 Pressure Vessels

XI RP Fiberglass Reinforced Plastic Pressure Vessels

NATIONAL R REPAIRS AND ALTERATIONS OF PREVIOUSLY

BOARD ASME “CODE STAMPED” VESSELS, BOILERS AND

INSPECTION PIPING

CODE

참조

관련 문서

Therefore, if an urgent result for the Pu isotopes is needed in an emergency situation or it is not necessary to measure the Pu isotopes for a long time due to the

② The applicant, either a foreign national or a Korean national who obtained permanent residency in a foreign country or who resides overseas, has

Prostate tumors shed circulating tumor cells (CTCs) into the bloodstream of patients diagnosed with metastatic, castration-resistant prostate cancer (CRPC) and Hormone

중유는 경제적으로나 정부의 친홖경 저유황 자동차 연료 정책에 따라 경질제품으로의 젂홖이 반드시 필요합니다. 세션 IV :

Alarm 관리 시스템을 구축하기 위하여 가장 우선 적으로 Alarm 및 Event (Operator Change, 예, SP/OP/MODE 변경)를 실시간으로 수집하여 표준 데이터베이스에

[r]

I understand that any false statement or deliberate omission in the information I have given in this questionnaire may disqualify me for employment or make me liable

지원자는 하나의 초빙분야만 지원할 수 있으며, 적격자가 없는 분야는 임용하지 않음 다.. 제출된 서류가 허위 또는 변조로