• 검색 결과가 없습니다.

Analysis of optimized survey methods for tunnel construction using IT

N/A
N/A
Protected

Academic year: 2021

Share "Analysis of optimized survey methods for tunnel construction using IT"

Copied!
6
0
0

로드 중.... (전체 텍스트 보기)

전체 글

Loading

수치

그림  4.  좌 :Surface Scan,  우 : 결과

참조

관련 문서

In this study, therefore, the method for measuring residual stresses using ESPI technique that is one of the laser applied measurement technique excellent in the view

It is possible to control the welding residual stress and deformation through the finite element analysis using jig free in-situ control technique of welding induced out

A) Clinical view of the recession defects B) Tunnel preparation with VISTA C) Deepithelialization using a high-speed handpiece at the hard palate. D)

41 Developing Web Intelligence System of Construction Tacit Knowledge Based on Text

– Unique objectives: Unique construction processes, information needed, management skills – Difficult to achieve uniform, standard information format.. – Diverse

– Unique objectives: Unique construction processes, information needed, management skills – Difficult to achieve uniform, standard information format.. – Diverse

Underground Sewage Treatment Plant, Trondheim, Norway 19.. Underground Sewage Treatment Plant,

data mining - process of applying machine learning, visualization, statistical analysis. knowledge discovery & construction - evaluation & interpretation of the extracted