• 검색 결과가 없습니다.

Ronnie Morales Abiog

N/A
N/A
Protected

Academic year: 2022

Share "Ronnie Morales Abiog"

Copied!
6
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Ronnie Morales Abiog

PERSONAL DATA

Age: 38

Date of Birth: Mar 23, 1970

Gender: Male

Civil Status: Married

Height: 171 cm

Weight: 70 kg

Nationality: Filipino

Religion: Christianity - Catholic

EDUCATION

Highest Education Second Highest Education

Education Level: Bachelor's / College Degree Post Graduate Diploma / Master's Degree Education Field: Engineering(Civil) Others

Course: BS Civil Engineering Master in Business Administration (21 units) School/University: Mapua Institute Of Technology PSBA, QC

Location: Manila Quezon City

Date: Jun 1987 - May 1993 1995 - 1998

LICENSES/CERTIFICATIONS

License/Certification Exam Taken License/ Certification No. Date

1. Board of Civil Engineering 69987 Apr 17, 1994

WORK EXPERIENCED

I have been working for 13.0 year(s).

Position: Planner/Schedule Engineer Duration: Sep 18, 2006 - Sep 17, 2008(2 yrs) Company: Chiyoda Corporation

Company Industry: Oil / Gas / Petroleum

Location Yokohama, Japan (Head Office)

Department: Project Control Department (International Project Operation) 1.

Job Description: Company: EPC contractor of liquefied natural gas & industrial refineries Major Project Locations: Middle East, Russia, Singapore, China, Australia

& Africa Tasks:

-Scheduler/Planner of Qatar Shell Pearl GTL EPC statusing 30 schedules with around 120,000 activities based on engineering reports, CDMS (Access-based Chiyoda Document Management System), procurement documents & site reports. Generates P3 and excel histograms & S-curves when asked.

-Developed 7,600-activity commissioning & start-up schedule for Feed Gas Preparation of Qatar Shell Pearl GTL Project (along with KBR) based on Work Execution Flow Scheme, System Activity Sheets and

(2)

coordination with functional departments. Generates P3 resource histograms/s-curves/tabular resource loading reports. Carries out resource analysis and leveling.

-Developed Preliminary Schedule: SPT Olefins Furnaces project for Exxon Mobil Singapore

-Developed Full Module Schedule: SPT Olefins Furnaces project for Exxon Mobil Singapore

-Prepares executive monthly progress report based on managers’ reports -Prepares evidence for ex-works and fabrication status reports

-Involved in pre-FEED study of British Petroleum-Chiyoda project (replacement of Main Cryogenic Heat Exchanger, Das Island, Abu Dhabi) -Revised P3 impact Schedule due to changes in Selexol Process design for Chiyoda-Technip JV (QGX Project: LNG Qatar Gas II On-Shore Development Project, Ras Laffan, Qatar)

-Assists in preparation of change orders

-Introduced Primavera v5.0 to the company through powerpoint &

hands-on presentation mainly on basic operations and import-export capabilities.

Position: Civil Engineer -Planner

Duration: Jun 4, 2006 - Jun 22, 2006(0 yrs) Company: Akkila Company Limited

Company Industry: Oil / Gas / Petroleum Location Abu Dhabi, UAE Department: Planning 2.

Job Description: Project: Jebel Ali Power and Desalination Station “L” – Phase II Storage Tank Erection at Dubai, UAE.

Tasks:

-Preparation of resource loaded project schedule, project execution plan, manpower cash flow, equipment schedule, overall cash flow, and

Inspection Test Plan. Generation of tabular and graphic resource report using Primavera P3. (I was originally Algeria-bound for RYM-SEKOURA, sister company of Akkila via UAE. Employer’s failure to secure visa as promised made me accept Chiyoda’s offer instead.)

Position: Civil Engineer-Scheduler

Duration: Aug 1, 2004 - Oct 6, 2005(1.2 yrs) Company: Lead Contracting Co., Ltd

Company Industry: Oil / Gas / Petroleum Location Doha, Qatar

Department: Construction 3.

Job Description: Project: EPIC (Engineering, Procurement, Installation and Construction) of RAG (Rich Associated Gases) & Flare Mitigation Integrated Project for QP’s NGL 1, 2, 3, & 4 @ Mesaieed

Tasks:

Tasks:

-Preparation of resource loaded construction schedule -Preparation of construction executive reports

-Updating of construction progress and revision of schedule

-Resource analysis through generated resource histograms/s-curves using Primavera P3.

-Preparation of change orders, method statements, work instructions &

dossiers

(3)

Position: Civil Engineer (QC Engineer) Duration: Jul 19, 2004 - Jul 31, 2004(0 yrs) Company: Akkila Company Limited

Company Industry: Construction / Building Location Doha, Qatar

Department: Construction/QC 4.

Job Description: Task:

- Preparation of method statements for Qatar Petroleum's RAG & Flare Mitigation Integrated Project subcontracted by Lead Co. from Petrofac Position: Quantity Surveyor

Duration: Jul 1, 2004 - Jul 14, 2004(0 yrs)

Company: Port Saeed Transport & Building Contracting Company LLC Company Industry: Construction / Building

Location Al Qousais, Dubai, UAE Department: Construction

5.

Job Description: Company projects: construction of Jumeira Beach Residence Villas, Dubai Municipality Roads & Construction of Several Car Parks in Dubai Tasks:

-Evaluated plans, contracts & estimates. Monitored work & financial progress. Mastered CESMM3.

Position: Engineer II (Project Controller/Scheduler) Duration: Nov 1, 1998 - Jun 23, 2004(5.6 yrs)

Company: Department Of Public Works & Highways Company Industry: Construction / Building

Location Puerto Princesa City, Region IV-B Department: Construction

6.

Job Description: Projects held: bridges, riverbank protection, roads, earthworks, flood control & drainage systems, government buildings, community water systems

Tasks:

Projects: Construction of bridges, riverbank protection, roads, flood control/drainage systems, government buildings and community water systems

Tasks:

-Preparation, updating & revision of construction schedules -Resource analysis through P3 generated tabular & graphic reports -Preparation of construction estimates

-Preparation of executive reports -Review of change order claims Position: Civil Engineer

Duration: Jan 1, 1998 - Oct 31, 1998(0.8 yrs) Company: Subcontractor

Company Industry: Construction / Building Location Puerto Princesa City Department: Construction 7.

Job Description: Projects: Construction & repair of government & private buildings, slope protections, drainages, roads & bridges

Tasks:

Project supervision, reviewed plans & company estimates, &

recommends change orders

(4)

Position: Rural Engineer

Duration: Jan 14, 1997 - Dec 31, 1997(1 yrs)

Company: European Union (for Palawan Tropical Forestry Protection Programme).

Co-financed By The Philippine Government Company Industry: Construction / Building

Location Puerto Princesa City Department: Engineering

8.

Job Description: Projects: Construction of community facilities such as water systems, multi-purpose pavements, school buildings & warehouses. We also assisted different Local Government Units on their infrastructure development programs.

Tasks:

-Design, planning, supervision, preparation of technical reports &

coordination with program counterparts, LGUs as well as the beneficiary communities

Position: Project QC Inspector

Duration: Jul 18, 1994 - Dec 30, 1996(2.5 yrs) Company: Philippine Long Distance Telephone Company Company Industry: Telecommunication

Location Ayala Avenue, Makati City Department: Provincial Expansion - Civil Works 9.

Job Description: Projects: construction of buildings, earthworks, huge underground structures, installation of underground telecommunication facilities, &

restoration of affected roads and other structures.

Tasks:

-QC inspection to ensure that all activities complied with plans and specifications. Likewise, to ensure that all materials were installed and in proper place

-Review of change order claims Position: Civil Engineer

Duration: Jun 1, 1993 - Jun 30, 1994(1.1 yrs) Company: Subcontractor

Company Industry: Construction / Building Location Metro Manila

Department: Construction 10.

Job Description: Projects: Construction of buildings, elevated water tanks & block perimeter fencing

Tasks:

-Supervision, coordination, quantity surveying, evaluation of plans -Preparation of estimates

-Change order claims

SKILLS

Skill Yrs of

Experience Remarks

1. Autocad 8 Latest is Autocad 2004

2. MS Project 5 Scheduling tool

3. Primavera (P3 v3.1,

Enterprise v5.0 & P3 Engg. &

Construction e/c v4.1)

5 For project scheduling, planning, control and management.

(5)

4. CESMM3 2 A fundamental requirement for the evaluation of the cost of proposed works & the calculation of the final accounts for work executed. Not well known in the Philippines, knowledge of this is a must for Planning Engineers & Quantity Surveyors.

5. MS Office 14 Visio, Excel, Word, Powerpoint, etc.

6. Marian 6i (v6.0) 1 For monitoring and updating of procurement activities

TRAININGS/SEMINARS

Date Topic/Course Title

Aug 5, 2004- Aug 5, 2004 Mesaieed Operations (Operations in Natural Gas Plants of Mesaieed, Qatar)/Topics: 1. Work Permit procedures, 2.Safety requirements

Qatar Petroleum

QP Training Hall, Mesaieed, Qatar May 19, 2003- May 30,

2003 Fast Track to Concept of Networking & MS Office Applications/Topics: 1. IT & MS Office, 2. MS Outlook &

Networking DPWH Region IV-B

DPWH Region IV-B Office, EDSA, QC May 9, 2003- May 10,

2003 4th Region IV PICE Technical Conference/Topics: 1. Outsourcing, 2. Project planning & management

Philippine Institute of Civil Engineers Puerto Galera, Mindoro

Jun 11, 2002- Jun 13,

2002 National Convention of AGCEP (Asso. of Gov't Civil Engrs. of the Phils.)/Topics: 1. New concepts of bridges & fly-overs, 2. Bored piles

AGCEP

Manila Hotel, Manila Mar 26, 2001- Mar 30,

2001 Bridge Construction Methods/Topics: 1. Bored & driven piles, 2.

Construction of bridges & fly-overs DPWH Central Office

DPWH Central Office, Port Area, Manila Oct 11, 1999- Oct 15,

1999 Preparation of Annual Maintenance Work Program for CY- 2000/Concern: Budgeting & planning in maintaining the national roads & bridges of Puerto Princesa City for CY-2000

DPWH Region IV-B Maintenance Division DPWH Region IV-B Office, EDSA, QC

1999- 2001 City Peace & Order Council/Concerns: 1. Disaster preparedness, 2.

Actions of City Disaster Coordinating Council City Government of Puerto Princesa

Puerto Princesa City, Palawan Nov 16, 1998- Nov 20,

1998 Preparation of Annual Maintenance Work Program for CY- 1999/Concern: Budgeting & planning in maintaining the national roads & bridges of Puerto Princesa City for CY-1999

DPWH Region IV-B Maintenance Division DPWH Region IV-B Office, EDSA, QC

(6)

ADDITIONAL RESUME INFO

Focused professional with a notable track record of success in project control, engineering, scheduling, work planning and quality control within high-caliber & high-pressure projects. Expect use and knowledge of Primavera P3. Competent with P3e/c, Primavera version 5, MS Project, &

Marian 6i. Highly proficient in MS Excel, Word and Visio. Experienced in oil and gas - EPC, Commissioning & Start up. Recipient of PMBOK (of PMI) lectures and trainings Competencies include: -Primavera P3, v5.0, P3e/c, MSP -Well-versed in EPC, Commissioning & Start up -

Preparation of Evidence for Ex-Works -Interim Progress Report -Change Orders -Marian 6i (v6.1) - Work Execution Flow Scheme -Resource Histograms/S-curves -Earned Value Information -Resource Analysis -Schedule Impact Analysis -Executive Report -Construction Management -Documentation &

communications

참조

관련 문서

대한의사협회 회원자율징계제도에 회원자율징계제도에 대한 대한 토론회 토론회 개최하 개최하 여 여 전문가단체의 전문가단체의 회원징계제도에 회원징계제도에 대한

Through our Cocoa Plan we work to improve the lives of farmers and address the root causes of child labor in our cocoa supply chain.

 An Iranian analysts writes in a reformist newspaper that Donald Trump’s Friday night speech in which he decertified Iran’s compliance to the JCPOA followed one key

Assessments of the economic factors (cost-benefit, Net Present Value), resource availability of the solar and wind energy, ground stability analysis for

In cloud computing the artificial intelligence based resource allocation techniques act and work like humans for resource allocation. Keeping the impact of artificial intelligence

Rule 1: 정보의 비가시성 (정보가치의 주관성) Information is invisible?. (The value of

Selected Techniques Practice 09 Team Presentation: Ideation TP2: Interim Report 10 Creative Thinking(4): TRIZ(1)-Introduction TRIZ Practice 11 Creative

• The ideal process that can serve as a suitable model for adiabatic steady-flow devices (e.g. turbine, compressors, nozzle).. EX 2) Effect of Efficiency on Compressor Power