• 검색 결과가 없습니다.

To build from scratch or to renovate?

N/A
N/A
Protected

Academic year: 2022

Share "To build from scratch or to renovate? "

Copied!
11
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

FACILITIES DESIGN &

CONSTRUCTION

PROFESSOR JOON-SEO A. CHOI. PH.D.

GREEN SPORT MANAGEMENT HANYANG U. GSI

7WEEK

(2)

REVIEW THE LAST CLASS!!

(3)

THIS CLASS QUESTION..

To build from scratch or to renovate?

“Hidden costs” of building anew:

Land purchases

Demolition & dumping costs

Energy, water, & pollution costs Renovation typically creates

“less waste”..

(4)

ANOTHER OPTION..

Minimum amenities

Leasing benefit (tents, seating, huts)

Re-selling benefit

Minimum impact on the site

(5)

RECIPE FOR A SUSTAINABLE FACILITY

Proximity Accessibility

LOCATION!!!

(6)

LOCATION..

(7)

ENVIRONMENTAL IMPACT ASSESSMENT

“A process whereby ALL aspects of a plan to build, renovate or upgrade facilities, or run an activity, are assessed by a neutral body of experts. A resulting EIA report should attempt to determine the best- and worst- case scenarios for all aspects of a proposed project and for the project as a whole. The environmental costs and benefits of the project should be listed both in

quantifiable and non-quantifiable terms. (P113)”

Easy to manipulate results!!

(economic >

environmental)

(8)

ENVIRONMENTAL AUDIT

Pre, midpoint, post audits may be ideal.

(9)

DESIGN, EQUIPMENT, & MATERIALS

1. Energy conservation 2. Water conservation

3. Flexibility & durability of building materials 4. Ease of assembly and disassembly

5. Presence of harmful compounds 6. Use of recycled materials

7. Less waste

8. Aesthetics concerns

Can be achieved through bidding process of vendors and contractors.

(10)

FINAL TOUCHES..

1. Clean-up: spills or contamination 2. Landscaping: Re-create a healthier

and more vibrant ecosystem

3. Construction waste management: Re-

use or re-sell materials. MINIMIZE

landfill dumping.

(11)

TAKE AWAY’S

1. To build from scratch should be the

LAST OPTION. What are other options?

2. Learn about 3-4 ways to minimize environmental impact when

constructing anew.

참조

관련 문서

CV-1808 (0.25, 0.5, 1, or 2 mg/kg, i.p.) treated immediately after acquisition trial of passive avoidance task or the first training trial of acquisition session of the

The test case used in porting LLVM compiler to template VLIW architecture is called Annotate- From-Scratch (AFS) build test case, a list of C test codes to check if the

[r]

I’d like to make small pots out of plastic cups or bottles and many pieces of colored paper.. Each cup or bottle should be large enough to grow

6 A monthly budget is a plan about how much money you are going to spend each month.. 7 Let’s be smart like Jenny by doing

세부전공에 따라 농학 또는 이학박사.

이 놀이에서 여러분은 많은 아이들이 원을 이루기 위해 손을 잡고 있는 것을 봅니다.. ③ 중국어를 정복하는

Ultrasonic pulses are sent into the body by a transmitter attached to the skin and are reflected from parts inside the body that are of a different