FACILITIES DESIGN &
CONSTRUCTION
PROFESSOR JOON-SEO A. CHOI. PH.D.
GREEN SPORT MANAGEMENT HANYANG U. GSI
7WEEK
REVIEW THE LAST CLASS!!
THIS CLASS QUESTION..
To build from scratch or to renovate?
“Hidden costs” of building anew:
• Land purchases
• Demolition & dumping costs
• Energy, water, & pollution costs Renovation typically creates
“less waste”..
ANOTHER OPTION..
• Minimum amenities
• Leasing benefit (tents, seating, huts)
• Re-selling benefit
• Minimum impact on the site
RECIPE FOR A SUSTAINABLE FACILITY
Proximity Accessibility
LOCATION!!!
LOCATION..
ENVIRONMENTAL IMPACT ASSESSMENT
“A process whereby ALL aspects of a plan to build, renovate or upgrade facilities, or run an activity, are assessed by a neutral body of experts. A resulting EIA report should attempt to determine the best- and worst- case scenarios for all aspects of a proposed project and for the project as a whole. The environmental costs and benefits of the project should be listed both in
quantifiable and non-quantifiable terms. (P113)”
Easy to manipulate results!!
(economic >
environmental)
ENVIRONMENTAL AUDIT
Pre, midpoint, post audits may be ideal.
DESIGN, EQUIPMENT, & MATERIALS
1. Energy conservation 2. Water conservation
3. Flexibility & durability of building materials 4. Ease of assembly and disassembly
5. Presence of harmful compounds 6. Use of recycled materials
7. Less waste
8. Aesthetics concerns
Can be achieved through bidding process of vendors and contractors.