s ofTFeTpplicant, marked *PRE-QUALIFICAfION DOCUMENTS FOR CIVIL CONSTRUCTION WONTS, TTNNER KULEKFI-ANI M HYDROELECTzuC PROJECT CIVIL LOT C- I " shall bi submitted in one "Maste/' and one "Duplicate" copies during office hours to thc ofiice ofKulckhani III Hydroelectric Project not later than the time and date specified hereunder:

Time and Date: l0c September, 2007 until l4:00 hours (Nepalese local time) '

Provided that if the pre-q ualifibation documents are sent by mail, Kulekhani lll Hydroelectric Project rvill not be responsible for not receiving the documents until the above mentioned date and time regardless of the reasons for the delay or loss of the mail. Documents which are received late will not be entertained.

(2)

r rrcgudrrrrualron oocuments wllt be opened in the presence ofapplicants representatives who choose ro attend at rhe above Kulekhani III Hydroelectric project office ^t'15,00 t;.;; i0,,.

S e p t e m b e r 2 0 0 7 . T h e a b o v e o p e n i n g p r o c e s s w i l l not be hampered even if ;;pii;;, representatives are not present.

6. Ifthe lasl date ofpurchase, submission and opening of the prequalification documentb falls on public holiday, then the next working day will be considered the last date.

T Thejoint venture ofdomestic contractors orjoint venture ofreputed international contractor(s) and domestic contractor(s) orjoint venture ofreputed inrernational contractors is acceoted.

8. Only qualified applicants will be notified to participate in the Tendering process.

9. Interested eligible contractors may obtain further information on the pre-qualification documents from the Kulekhani III Hydroelectric Project office.

ld.it is recommended that interested eligible contractors familiarize themselves with the local conditions and visit the project site. The costs incurred for the preparation and submission of pre-qualification documents, and site visit(s) are to be borne by ihe applicant.

I | .The applicants could also visit our wbbsite www.nea.or&np.

l2 NEA reserves the right to accept or reject any or all applications for pre-qualification assigning any reason whatsoever.

Tfte Project Chief

Kulekhani III Hydroelectric Project

Generation,Gerieration Construction Department

Nepal Electricify Authority

,-{,Cl Y":."_b_! tf-rl, Kat h m a n d u, Ne p a I 977 -l-4465017, Fax.No. 00-977- | -4;61 4 4 A n u p M a r g , M c c n b h a * a n , K a t h m a n d u , Neprl T e l . N o . 0 0 - 9 7 7 - l - 4 4 6 5 0 t 7 , F a x , N o . 0 0 - 9 7 7 - I _ 4 4 6 5 0 r 8 Tel.

E-mail: neakl3@wlink.com.np

참조

관련 문서

(6) A person intending to participate in a tendering procedure for a construction project shall submit a calculation sheet along with a written tender when making a tender to

The Ministry of Urban Development and Housing-Federal Government Buildings Construction Project Office invites sealed bids for category I / BC 1 or GC

- Homework : Programming in Matlab or any other language (F,C,C++) - Computational Project : A report with program and documentation - Final Project : Individual (or team)

[r]

나는 멋진 휴대 전화를 가지고 있다!.

이 때문에 그는 아직도 가장 위대한 챔피언 으로 여겨지고 있다... (challenges) 이고 관계대명사절에서 전치사의 목적어 역할을 하 므로

- Involvement of central bank in financial supervision (O, -), public governance (O, +), population (O, -), structure of financial system, legal roots (△, + for Civil

Civil Engineering, Energy & Resources Engineering, Architectural Engineering, Environmental Engineering, Mechanical Engineering, Vehicle Engineering,