• 검색 결과가 없습니다.

Merope Jr. Banquil Bautista

N/A
N/A
Protected

Academic year: 2022

Share "Merope Jr. Banquil Bautista"

Copied!
4
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

Merope Jr. Banquil Bautista

PERSONAL DATA

Age: 41

Date of Birth: Sep 26, 1967

Gender: Male

Civil Status: Married

Height: 196 cm

Weight: 80 kg

Nationality: Filipino

Religion: Christianity - Others

EDUCATION

Highest Education

Education Level: Prof'l License(Passed Board/Bar/Prof'l License Exam) Education Field: Engineering(Civil)

Course: Bachelor of Science in Civil Engineering School/University: University Of Mindanao

Location: Davao City, Philippines Date: Jun 1983 - Jun 1987

LICENSES/CERTIFICATIONS License/Certification

Exam Taken License/

Certification No. Date 1. Philippine Regulation Commision Civil

Engineering Board Examination 0057501 Jan 15, 1990

WORK EXPERIENCED

I have been working for 18.0 year(s).

Position: Project Manager

Duration: Jul 2003 - Aug 2007(4.1 yrs) Company: TRADCON Trading And Construction Company Industry: Construction / Building

Location San Mateo Rizal Department: Management 1.

Job Description: 1.Taking over the entire operation of the company.

2.Taking care of marketing/sourcing of projects.

3.Manages the whole operation of the company.

4.Preparing Quotations, Bidding applications, Pre-qualifications for bidding.

5.Planning and implementation of the project.

6.Billings, Payroll and checking all the accounting (expenses/collections) of all projects.

Major Projects Accomplished:

1.Central Luzon Doctors Hospital General Renovation.

2.Philippine Kidney Institute Office Renovation.

(2)

3.Construct 8doors apartment - Mr. Leonardo Mendoza – Contract Amount - 3M project

4.Douplex House – Ms. Baby Sanchez & Ms. Ma. Lourdez Sanchez – Contract Amount - 2.5M

5.Annex Residential Building & General Renovation – Mr.& Mrs. Criste Villanueva – Contract Amount - 1.5 M Project

6. 2 storey Res. Project – Engr. Ronaldo Marasigan – Contract Amount - 4M Project

7. 2 storey Res. Project – Mr & Mrs Lenie Ruiz – Contract Amount - 3M Project

8. 2 storey Res. Project – Mr. Mikhail Jan Jan Koh – Contract Amount - 4.5M Project

9. 2 storey Res. Project – Engr. Joseph Silloreguez – Contract Amount - 3.5M Project

Position: Project/Construction Manager Duration: Feb 15, 1992 - Jun 13, 2003(11.3 yrs) Company: Abdullah Mosleh Organization

Company Industry: Construction / Building Location Jeddah Saudi Arabia Department: Main Office

2.

Job Description: 1. To implement the companies directives given by the Owner/Managing Director (Sheik Abdullah Mosleh)

2. The main function is to look over generally on all aspects of all the projects particularly on project planning, time scheduling, quality of work, workers productivity report handed over by the project in charge (Project Manager or Project Engineers). To prepare and consolidate final reports for bidding new projects such as bill of quantities, bill of

materials, tools and equipments requirements, manning requirements and time scheduling.

3. To prepare and present the final bidding price of the projects to the Owner/Managing director making consideration of the expected profit and loss and to include report on all possible causes of profit and loss.

Bidding prices shall be approved by the Owner/Managing director before submitting the final documents for bidding.

4.To initiate and make strategies on sourcing new projects so that business operation of the company will be continuous maintaining the stability of the company. Specially on maintaining continuous costumers relation on old clients because those clients may recommend new prospects.

5.Make decisions on manpower movement problem from one project to another as to their manpower needs so that every activities of every project shall not be delayed due to insufficient manpower supply.

6. Making annual performance evaluation on all subordinates necessary for future promotion of every employee.

MAJOR PROJECT HANDLED

1. Ikea Riyadh Warehouse and Guardhouse.

Contract Value : SR 8,000,000.00

2. Caza Nora Commercial center (Sari St. Jeddah).

Contract Value : SR 4,000,000.00

3. Saudi Aramco Musaadia Building Modification Project. (Jeddah) Contract Value : SR 5,000,000.00

4.Al Khayat Comm. Center ext.- Conc. Precast structure (Tahalia St.

Jeddah)

Contract Value : SR 7,500,000.00

(3)

5. Madina Tower Commercial Center Contract Value : SR 4,500,000.00

6.Internet Café Finishing, electrical and computer networking (Jeddah City Center)

Contract Value : SR 500,000.00 7.National Air Services

Contract Value : SR 1,500,000.00

9. Al Motlaq Mosque Structural work implementation (Near King Abdul Azziz University)

Contract Value : SR 1,500,000.00

10. Al Khayat Red Bricks Factory Bahara (Construction for bricks factory kiln- Civil works and all Mechanical fittings)

Contract Value : SR 1,000,000.00

11. Casa Blanca Hotel – Jeddah and Taif (Yearly Renovations and expansion)

Contract Value :

12. Marriot Hotel – Jeddah (Plumbing System Modification) Contract Value :

SKILLS

Skill Yrs of

Experience Remarks 1. Computer Programming:

Basic, Dbase3+, Clipper, Foxpro, Foxbase,

Quattro/Lotus123, Macro Engineering: Computer Aided Design (CAD) Networking: Novel Netware Windows: Various Windows Application Programs to include among others, Word, Excel, Power point, Turbo C++, Visual Basic and etc.

Primavera, Microsoft Project.

12

TRAININGS/SEMINARS

Date Topic/Course Title

Jul 2003- Jul 2003 Turbo C++ – Computer Programming Meralco Foundation

Manila Philippines

Aug 2002- Aug 2002 Internet, Browsing, Web page design and publishing Philippine Consulate

Jeddah Saudi Arabia Aug 2002- Aug 2002 PC Assembly

Philipine Consulate Jeddah Saudi Arabia

1999- 1999 Visual Computer Programming IEEE

Jeddah Saudi Arabia

(4)

1994- 1994 Lost Prevention Control Saudi Aramco

Jeddah Saudi Arabia Oct 1987- Oct 1987 Construction Management

Philippine Institure of Civil Engineering Davao City

Sep 1987- Nov 1987 Matrix Structural Analysis Computer Technology Davao City

참조

관련 문서

Analysis of Project Purpose by Project We analyzed 6 types of projects based on the target classification for planning purposes.. First, the analysis results of the planning

③ (Committed Stage) Projects at this stage of the development cycle have completed all commercial, engineering and environmental studies, received all

On the behalf of the Korean Government, I am very delighted and honored to be here with you today on the occasion of providing equipment for the

SMS reduced clinical signs of DSS-induced colitis, including body weight loss, shorten colon length, and increased disease activity index.. The results showed that

The main objective of the Bi Regional Center for SMES Development is oriented towards generating the conditions of cooperation among the countries which

To solve the fundamental issue of rendering time, utilizing a physics engine, like game engine enable working on the rendering time without burdens in

q March 28, 1906: County Magistrate Shim Heung-taek of Uldo-gun[Uldo County] heard this news from the Japanese survey team, he reported to the Korean central government

• Theme : Confidence Building Measures in cyberspace Session I: Existing and potential threats in cyberspace Session II: CBMs in the context of cyber security?.