• 검색 결과가 없습니다.

Departmm''TJKJI;TililifilY;:-iIlH-i**r*thmandu'Nepar from - -- I

N/A
N/A
Protected

Academic year: 2022

Share "Departmm''TJKJI;TililifilY;:-iIlH-i**r*thmandu'Nepar from - -- I"

Copied!
1
0
0

로드 중.... (전체 텍스트 보기)

전체 글

(1)

LP

Nr,v o

I

k

Govemment of NePal

Ministry of Physical Infrastructure and Transport Department of RailwaYs

Railway and Nlonorail Development Project

Kathmandu Notice No.: 0210711072

'

, lnrii.,

fipieqs-ion

diiiffiid?ixdi;Lrrir consifrtiin.y sl.ri."sJor

the FeaSibitrfr--sfrl-y of

--

Nij gadh-Hetauaa-nUaratpur Elecirified Railway Line

1.

In order to meet the growing passenger and freight transport demand, Govemment of Nepal has long felt the necessity of development of railway as an alternative land hansport mode for faster and cheaper movement of freight and passenger traffic' In pursuance to the objective, GoN through consultants has completed the Detailed Project Report for constructing proposed new Railway lines

in

Nepal

which

include Bardibas- Simara, Simara

-

Tdmsariya and Tamsariya - Butwal of Mechi-Mahakali Railway (945lrn). Recently the final report presentation

for

Simara - Tamsariya took place. The cost of this section found to be at higher side due to mitigatiofl measures adopted

while

encompassing Parsa

Wildlife

Reserve (PWR) and Chitwan National Park (CNP). There were suggestions to avoid crossing of PWR and CNP due to world heritage site and preservation of endangered species.

2. Ministry of

Physical Infrastructure and Transport, Government of Nepal hence plans to conduct Feasibility Study of Nijgadh- Hetauda -Bharatpur Electrified Railway Line

with

a

view to introduce high speed

rail

system. Budget for this work has already been allocated - in this F.Y.20711072.

3.

The objective of the assignment shall be to conduct Feasibility studies, prepare preliminary Cost Estimate and recommend best technical, financial and economical alignment. The

duration of the consultant's servipes is estimated to be twelve (12)

months.

4.

Expected date of commencement of the assignment is Jan 2015.

5.

Departmenl of Railways on behalf

of Ministry

of Physical Infrastructurp and Transport,

.

Government of Nepal, invites eligible consultants to indicate their interest in providing the

'

services. Interested Consultants must provide information indicating that they are qualified ls.perform the services, consultants may associate to enhance their qualifications and are encouraged to make association with the local Nepalese consultants.

Multiple

association

of Nepalese consultant with international consultants will not be

accepted.

6.

Consultants

will

be selected in accordance with the procedures set out in the Procurement Act2063 (2007) and Procurement Rules 2064 (2007).

7.

The Consultant and its team dhall possess significant knowledge and proven experience

in

the planning and design of electrical Railway systems, their operations and implementafion

In

order to determine the capability and experience of the consulting firms seeking to be short listed, the information submitted should include the following:

Company profi le, organization.

--

Annual turnover for consecutive five years ending2013.

Details

of

experience

of

similar assignments undertaken

in

the previous

five

years.

Details of work

experience

of working in similar

geographic region/country,

- Information regarding related professional staff and their field of

expertise.

8.

The EOI document should be collected from the following address free of cost. The document

may also be downloaded for the reference purposes

from

'

. Interested consultants may obtain further information at the address below during office hours (10:00

to

l5:00 local time)

g.

Expressions of interest must be delivered to the addrbss below

by

14:00 hours local time on or,Lefoie the

3lst

day from the date

of first

publicatiori

of

this notice.

]flh.t

last date

of

submission of EOI happens to be a public holiday, the next working day shall be considered

as the last date of submission. The EOI submitted shall be opened at 14:00 hourS on the next working day in the presence of representatives of Department of Railways

&

representatives of consulting firms.

10.

Only

short i=isted consultants

will

be invited to submit Technical and Financial proposal.

Departmm''TJKJI;TililifilY;:-iIlH-i**r*thmandu'Nepar

woa

affi

참조

관련 문서

Indeed, the growth of the bone width relative to that of the bone length was inhibited by reproduction in animals having received normal nutritional state.. As the data

Current Tokyo is rich in green compared to other metro cities. In some parts, the greenery has been contributed by the many inherited gardens from the Edo era to today which

Also, potential radiological exposure pathways are investigated for analysis of exposure doses of workers and the public due to normal decommissioning activities..

As you are aware, I had received a mandate from the General Council to undertake consultations, in coordination with the Chairman of the Committee on Trade and Development

However, the various methods used in the customer-based pricing approach can be applied to railway services as well: examples include the estimation of demand and analysis

bility of our experimental setup, because viscoelastic property of ppy during electrochemical deposition has been recently examined in the electrolyte solution by Muramatsu et

• 대부분의 치료법은 환자의 이명 청력 및 소리의 편안함에 대한 보 고를 토대로

• 이명의 치료에 대한 매커니즘과 디지털 음향 기술에 대한 상업적으로의 급속한 발전으로 인해 치료 옵션은 증가했 지만, 선택 가이드 라인은 거의 없음.. •